New inter provincial channel!Qingpu s two major plans were approved for public announcement!

Mondo Social Updated on 2024-01-31

Important.

Qingpu has added a new cross-provincial channel

Jinshang Highway South Extension (Huqingping Highway - Jinhu Road).

1. Planning background

According to the "Yangtze River Delta Ecological Green Integrated Development Demonstration Zone Pilot Start-up Area Land Space Master Plan", the start-up areaA new north-south corridor will be opened, contact the network of minor towns such as Jinxi-Jinze-Yaozhuang,The road connects to the current Jinshang Highway - Jinshang Highway to the north, and extends to Jiashan Avenue in Jiashan County to the south, serving regional integration linkages. In order to improve the regional road network and implement the new channel lines, a special plan for the route selection of the southern extension of Jinshang Highway was carried out.

Second, the planning scheme

Planning scope: from Huqingping Highway in the north to Jinhu Road in the south, the road is about 6 miles long1 km.

Functional positioning: to support the external channel of the integrated development of the demonstration area near Shanghai, and to undertake the contact with the secondary network node towns of the demonstration areaDivert the freight of National Highway 318 to serve the function of Qingpu District to connect with Kunshan Jinxi and Jiashan.

Standard and scale: The suburban section shall be in accordance with the technical standards of secondary roads (urban sections), and the urban sections shall be in accordance with the technical standards of urban trunk roads. The road has a two-way 6-lane scale and a design speed of 60km h.

Road direction: The southern extension of Jinshang Highway starts from the intersection of Jinshang Highway and Huqingping HighwayIn the form of a bridge, it will cross the existing G50 Shanghai-Chongqing Expressway and the demonstration area line under construction, and then cross the elevated Shanghai-Suzhou-Lake Railway under construction in the southward direction, and connect with the Jinze Town section of the water town living room.

Second, the planning scheme

In order to enhance the feasibility of the southern extension of Jinshang Highway, it is planned to make synchronous adjustments to the intersecting roads and Malan Port and other rivers along the line, and use the adjusted river space to set up a slow traffic system under the G50 Shanghai-Chongqing Expressway to serve slow travel in the areas along the line.

It is planned to set up a rainwater pumping station in combination with the G50 slow passage under the road, and the rainwater pumping station is located under the G50 bridge on the Jinshang Highway (see the plan for details of the facility location), and the land will no longer be separately demarcated.

3. Planning control requirements

Combined with the planning plan, adjust or add the red line of the Huqingping Highway-Jinnan section of Jinshang Highway. The width of the red line of the standard section is 45 meters, the width of the red line of the widening section is 50 meters, and the red line is adjusted to 40 meters and 45 meters to 60 meters in some sections to coordinate the protection of cultivated land along the line and the Shanghai-Suzhou Lake railway project. The red line of Jinnan Road to Jinhu Road will maintain the original plan. Combined with the needs of the project, the red line of the intersecting road Huanhu North Road was adjusted synchronously, and the width of the red line of the adjustment section was 24m.

Related Pages