**Construction is a comprehensive complex factory, which requires the collaboration and cooperation of multiple links such as planning, design, front-end and back-end development, testing, etc., in this series of operations, the product manager (project manager) is a role throughout the entire process.
So what is the process of **construction?
1.Requirements analysis
This stage is mainly the stage of communicating with customers, collecting customer needs, and then understanding customer needs and sorting out customer needs.
2.Project planning
Make a detailed project plan, clarify the project schedule, arrange when to prototype planning, when to design, when to develop in the front-end, when to develop in the background, and when to release and go online, and each stage has a rough timeline.
3.Domain name, server
Register the domain name of **, and then determine the server configuration, the server is deployed in **, and whether ** wants to file or not are related.
4.Prototype planning
The prototype planning stage is mainly to confirm the column structure, including page layout, navigation structure, etc.
5.Design phase
Through UI design, customize the unique design style, including web page color, layout, font color, icon and other designs.
6.Front-end development
Front-end development is to write the design draft html to achieve page production to ensure compatibility on various devices and browsers.
7.Back-end development
Background development is to realize the linkage between the background and the foreground, and the corresponding content can be published in the background, and then the front-end page will be updated accordingly to achieve some functions of the first place, and at the same time, through database management, save and store data, 8,
8.Testing phase
The test phase is mainly to test the **function**, such as adding content in the **background**, to see if the corresponding foreground will change, such as testing some functions to see if it works, and at the same time to check the compatibility of the **page**, conduct **page compatibility test, access on different devices**, and see how it is.
9.The content is complete
Improve the content, add products, articles, cases, solutions, etc.;
Complete company information such as company profile, qualifications and honors, development history, etc.;
At the same time, improve the name, title, keywords, description, etc.
10.Deploy online
After there is no problem with the content, you can configure the domain name resolution, and the deployment is online, and after the deployment is online, you also need to conduct a system test on the website, so as to ensure that everything is normal after the launch.