In the fierce battle of the wind and snow, the Shunlong people held on in the heavy snow

Mondo Social Updated on 2024-01-30

From December 18 to December 19, 2023, the Nanjing Meteorological Observatory upgraded and issued an orange warning signal for heavy snowfall. Under the orange warning of blizzard, all employees of Nanjing Shunlong Municipal Construction Project actively responded to the preparation work before the heavy snow and the snow shoveling and freezing guarantee work after the snow.

The day before the snowfall, first organize employees to conduct self-inspection, and then prepare snow clearing tools to insulate the water pipes, water meters, faucets and other available fabrics exposed to the outdoors in the river of the pumping station within the maintenance rangeClose the valve in front of the water meter, open the faucet, and drain the remaining water in the water pipeTurn the faucet on a little and the water comes out in a line to keep the water flowing in the hose and make sure the water runs smoothly.

After the snow began to fall on the morning of the 18th, the employees of Shunlong Construction overcame the bad weather, stuck to their posts, and completed their work.

River cleaners in the Xiaotaoyuan section of the northwest moat and the Jinchuanmen trash trap section salvage garbage on the water surface in the heavy snow to ensure the cleanliness of the river.

At the same time, non-slip sacks are laid in time and snow falls in the dry area are cleared.

From the evening of the 18th to the early morning of the 19th, the employees of Shunlong Construction actively participated in the snow and ice removal work to ensure that the snow and ice on the main traffic ground, the "three bags in front of the door" responsibility area, the roads in the courtyard, the greening and the canopy were cleaned up in time to ensure the safety of traffic.

Li Hui.

Related Pages