Smooth travel The bus flexibly adjusts the capacity

Mondo Social Updated on 2024-01-29

Reporter Wang Jian Chang Qing.

In the early morning of December 11, heavy snow fell on Jinan. Heavy snow meets Monday's morning rush hour, and how to ensure the safety of citizens has become the top priority.

We quickly activated the emergency plan for severe weather, and all the auxiliary police officers were on the road, intensified road patrol control, and deployed various measures to ease traffic. Huang Lei, deputy director of the command center of the traffic police detachment of the Jinan Municipal Public Security Bureau, introduced.

In the face of continuous snowfall, public transportation has become the choice of many citizens. Yang Zengyong, director of the operation and marketing department of Jinan Public Transport Group, introduced that they adopt flexible and effective scheduling forms such as interval buses, large station express trains, direct trains, and cross-line support to improve vehicle operation efficiency and line carrying capacity, and minimize the impact of low temperature, rain and snow weather on public travel. Because of the snowfall, some roads in the southern mountainous areas do not have the conditions for bus traffic, and many bus lines such as 809, 811 and 813 are temporarily suspended, and 812, 881 and 883 are adjusted to run in the interval, and normal operation will be resumed in time depending on the road conditions.

The Jinan Bureau of the National Railway quickly launched an emergency response and actively carried out snow and ice removal operations to ensure the safety of railway transportation. 22 de-icing electric locomotives will be arranged at 14 key stations such as Jixi Station, Jinan Station and Yanzhou North Station, and 15 groups of ice-melting EMU trains will be arranged in 5 EMUs in Qingdao, Qingdao North, Jinan, Jinan East and Linyi. On the 11th, 7 groups of 19 high-speed ice-melting EMUs were opened, and 2 general-speed railway de-icing locomotives were dispatched.

Shandong High-speed Group issued the "Notice on Effectively Doing a Good Job in the Prevention and Response to Cold Wave, Rain and Snow Weather", carried out echelon snow removal operations at the first time, spread snow melting agents in a timely manner, and carried out dynamic snow removal on key road sections such as ramps and bridges. As of 14 o'clock on the 11th, the group has invested more than 3,000 man-times, spread more than 4,400 tons of snow melting agent, and dispatched more than 900 sets of vehicle machinery and equipment to ensure the safety and smoothness of the road.

Related Pages