Does the basement need to reserve the exhaust pipe in advance?

Mondo Home Updated on 2024-01-26

Sometimes, when the customer's home hydropower is constructed, the sewage lifting pump business has not yet been determined, so there is no technical personnel to dock the pipeline reservation. You can only rely on the experience of the hydropower master to do, the experience may not be a big problem, many have not installed the lack of experience of the lifting pump, may not consider the need to reserve the exhaust pipeline, so when installing the sewage lifting pump, you ignore the treatment of ventilation, which also leads to many owners after the installation of the sewage lifting pump after the smell is very heavy.

If you do not reserve the ventilator pipe in advance, it will easily lead to the smell back, and the smell will be very heavy and miserable for a long time, in addition to the ventilation pipe also plays a role in balancing the air pressure to ensure the smooth drainage.

Therefore, it should be noted that we must separate the ventilation tube independently when it is buried, and cannot be connected in series with any trachea, in case the later stage of the cross-smell is still miserable.

In the end, there is really no reserved ventilation pipe, we can only install air valves and activated carbon to solve, and regular replacement of activated carbon can also be solved, but this is not a long-term solution after all, so here is a reminder that the pipeline design of the sewage lifting pump must be planned before the hydropower enters the site to prevent some problems that cannot be solved in the later stage.

Related Pages