When installing a polypropylene pp welded water tank, the following points should be noted:

The foundation of the water tank should be designed according to the actual situation of the site. It should be ensured that the soil quality of the foundation is stable and there is no leakage;Ensure that the flatness requirements and a certain strength can be reached after pouring (cement grade is not less than 325). At the same time, the hole (distance) of the fire hydrant should be reserved. In the pretreatment process, it is strictly forbidden to destroy the quality standards such as the position and firmness of the structure or embedded parts, as well as the aesthetic effect of the appearance.

In addition, it is necessary to deal with the corners and bottom seals of the connection parts to prevent the concrete from falling in, affecting the use and easily causing the problem that it cannot be cleaned in the later stage. One of the key steps is to clean the formwork splicing gap, fill it fully and fix it without displacement, so as to maintain the quality of the weld and the integrity of the alignment joint partsAfter the completion of the project, the surface of all parts should be cured with an anti-rust, anti-corrosion safety protective layer, and the finished product should be protected to avoid artificial damage or bumps, falls and scratches, so as to ensure the aesthetics and durability of the product for long-term use.

After these preparations, the formal production process can be started to ensure the smooth progress of the entire process and quality assurance. For the newly installed system, it must be put into operation after the trial operation is normal, and attention should be paid to check whether the pipeline accessories are flexible, reliable and smoothWhether the valve position is correct, whether the opening and closing state meets the process requirements, whether the pressure gauge can be used normally, etcIt is also necessary to regularly inspect the readings of various instruments in order to keep abreast of the operation of the equipment and the changes in the liquid level of the liquid storage equipment, and to take timely countermeasures to the occurrence of problems such as the operation of the equipment and the liquid level of the liquid storage equipment.

The above is the relevant precautions for the assembly of polypropylene pp welding water tank!Hope it helps.