The whole process of decoration is collected for later use

Mondo Home Updated on 2024-01-31

Friends who are ready to decorate, be sure to collect this detailed decoration process. It includes the construction time and sequence of each project, as well as precautions, so that you do not miss or step on the pit.

First, the general process of decoration

Find a good designer to design (if any) Review construction** Confirm** Sign the contract Start demolition Hydropower positioning Hydropower renovation Carpentry construction (if any) Bricklayer construction Oil construction Kitchen and bathroom ceiling measurement and installation (need to install the bath bomb exhaust pipe and range hood exhaust pipe in advance) Cabinet installation Wooden door installation Lamps, switch and socket panels, sanitary ware, hardware installation Wood floor installation Custom furniture installation Cleaning Cleaning Furniture and soft decoration configuration Check-in.

Second, the main material preparation and customization docking time and precautions

According to the above-mentioned decoration process and project schedule, the owner needs to prepare the relevant main materials and cooperate with the relevant manufacturers, mainly as follows:

1.Before the positioning of hydropower - the cabinet manufacturer needs to go to the site to make the first measurement and determine the location of the relevant hydropower points.

2.Before carpentry construction, if the top surface of the kitchen and bathroom is a gypsum board ceiling, you must choose a bath bomb and range hood in advance, purchase or let a bath bomb merchant install a check valve and exhaust pipe, and determine the size of the bath bomb opening and the opening size of the smoke pipe.

3.Before the construction of the bricklayer - the wall tiles, floor tiles, and floor drains need to be prepared in place in advance (if the windows are replaced, you need to communicate with the manufacturer to measure the windows when dismantling, place an order for customization, and the installation needs to be completed before the bricklayer construction).

4.After the kitchen wall tiles are completed, it is necessary to notify the cabinet manufacturer to re-establish the size and start processing and production.

5.After the floor tiles and floor leveling are completed, it is necessary to notify the wooden door manufacturer, customize the wardrobe to measure the size, and process and produce.

6.After the kitchen and bathroom wall and floor tiles are completed, it is necessary to notify the aluminum gusset manufacturer to measure and install.

7.Before the installation of the aluminum gusset ceiling in the kitchen and bathroom - the exhaust pipe of the bath bomb and range hood needs to be installed in advance, if there is a built-in water heater, you need to install the water heater first and then the ceiling, and the bath bomb should be prepared in place.

8.Before installing the cabinets - the range hood, gas stove and vegetable washing basin need to be prepared in place.

9.Wooden door installation - If there is wallpaper, you need to paste the wallpaper first and then install the wooden door.

10.After the oiler is completed, the lamps, switches and socket panels, sanitary ware, hardware, etc. need to be prepared in place.

The above is the process and precautions for decoration, if you have any problems with decoration, you can communicate in the comment area. 2023 Post Sprint Competition

Related Pages