Recently, there are many people who have consulted about the problems related to the high-strength cement floor slab of Oriental Loft, and the following is an article about it, and you will have a more in-depth understanding of it after reading it.
Oriental loft high-strength cement floor slab is a high-quality floor slab material with high strength and durability. During the construction process, the following aspects need to be paid attention to.
1. Material preparation: Before construction, you need to prepare the required materials and tools, including cement, mortar, homogenizer, level, etc.
2.Foundation treatment: Before construction, the foundation needs to be treated to ensure that it is flat, dry and free of debris. If necessary, the mortar layer or waterproof layer should be made according to the design requirements.
3.Layout grid: Before construction, it is first necessary to arrange with wire grid to increase the load-bearing capacity of the floor slab. The mesh should be laid flat and the mesh should be consistent with the design requirements.
4.Template installation: After the grid layout is completed, the template installation is required. The formwork should be neat and stable to ensure the flatness and strength of the floor slab.
5.Concrete pouring: After the formwork installation is completed, the concrete pouring work can be carried out. Concrete should be poured evenly to ensure consistent strength and density throughout the slab.
6.Leveling plastering: After the concrete pouring is completed, the leveling plastering work needs to be carried out. The plastering layer should be uniform and flat to ensure the flatness and aesthetics of the floor surface.
7.Maintenance: After the construction of the floor slab is completed, maintenance work needs to be carried out. During the curing period, the floor slab needs to be kept moist to enhance the strength and durability of the concrete.
During the construction process, the following points need to be noted.
1. Construction environment: During construction, a dry, waterless and obviously polluted environment should be selected to ensure the quality of the floor slab.
2.Formwork treatment: The formwork should be made of solid materials, and attention needs to be paid to the installation position and fixing method of the formwork to ensure that there will be no displacement or damage during the construction process.
3.Concrete ratio: The ratio of concrete should meet the design requirements, and the water-cement ratio of concrete should be controlled to ensure the strength and durability of concrete.
4.Construction operation: The construction personnel should be proficient in construction technology to ensure accurate and meticulous operation, so as to avoid poor construction caused by floor quality problems.
5.Curing conditions: During the curing period, it is necessary to keep the floor slab moist and avoid ultraviolet radiation and excessive drying to ensure adequate hardening and strength development of the concrete.
The construction technology and precautions of Oriental Loft high-strength cement floor slab are closely related to its material performance and design requirements, and only by operating in strict accordance with the construction requirements can the quality and service life of the floor slab be ensured.