The construction process of beauty sewing

Mondo Home Updated on 2024-01-29

The construction process of beauty sewing includes the following steps:

Crack cleaning: Use a shovel blade to clean the dust in the crevices, the deeper the crevices, the better. Then use a vacuum cleaner or brush to clean the dust from the surface and crevices of the tiles.

Wipe the seam: If the edge of the gap is not clean, the seam made has blemishes and black edges.

Waxing: The purpose of sewing wax is to make it easier to clean up the leftovers the next day.

Gluing: Before gluing, punch out about 10-20 cm of material. The mixing rod should be at an angle of 45° to the tile surface as much as possible so that the grout can fill the gap, slowly and forcefully apply the material evenly in the joint, and grasp the strength and frequency, and move the mixing tube backward evenly to ensure that the tile gap is filled evenly and full.

Caulking: First use the caulking piece to open a gap, and after 24 hours of material solidification, use a cleaning shovel to clean up the remaining materials. The criss-cross gap should not be pressed repeatedly, and the seam should be pressed from the middle to the periphery.

Glue shoveling: The curing time of the sewing agent is generally 6-8 hours in summer, and the time is extended in winter and rainy and snowy weather, and the glue can be shoveled after the surface of the sewing agent is cured. If you have masking paper attached, tear off the masking paper directly. If you don't use masking paper and waxing, use a cleaning shovel to shovel glue. Note: The masking paper should be peeled outward.

The above is the construction process of Meisew, for your reference, it is recommended to consult professional construction personnel to obtain specific information.

Related Pages