When installing and constructing a clean shed, there are some key steps and points to be aware of. The following are the general steps and precautions for installing and constructing a clean shed:
Planning and design: Before installation, reasonable planning and design are required. This includes determining the size, shape, equipment and materials required for the clean shed. In addition, a detailed construction plan and schedule need to be developed and the relevant codes and standards are ensured.
Determine the location of the installation: Choose an appropriate location to install the clean shed, usually in a relatively enclosed space, away from sources of pollution and noise. Once you've decided on a location, you'll need to make the relevant preparations.
Installation support structure: The support structure of the clean shed is usually a frame made of metal or aluminum alloy, which needs to be assembled and installed according to the design requirements. Ensure the stability and stability of the support structure to support the subsequent installation work.
Installation of walls and ceilings: The installation of walls and ceilings in clean sheds requires the use of special materials, such as stainless steel plates, to ensure cleanliness and good maintenance performance.
Installation of clean shed door: According to the requirements of the design, the door of the clean shed can be PVC curtain, automatic door or door with air tightness to ensure that the air inside and outside the clean shed will not pollute each other.
Installation of fan filter unit FFU: The fan filter unit FFU is generally installed in the clean shed to maintain the temperature, humidity and cleanliness in the clean shed. The installation of FFU needs to ensure proper air duct design and air volume control to meet the requirements of cleanliness.
Installation of clean shed equipment: according to specific needs, install clean workbenches, clean surgical lights, air filters and other equipment to ensure their normal operation and effective work.
System debugging and testing: After the installation is completed, system debugging and testing are required, including the operation of the air conditioning system, the cleanliness test and the functional test of the equipment.
Preparation of installation acceptance report: After the installation is completed, the acceptance and installation acceptance report shall be prepared to ensure that the installation work meets the relevant specifications and requirements.
All in all, the installation of clean sheds requires construction in strict accordance with design requirements and specifications to ensure that clean sheds have good cleanliness and performance. At the same time, for some key engineering links, such as the design of the air conditioning system and the installation of air filters, a professional team may be required to carry out construction and commissioning to ensure the effective operation and use of the clean shed.