How to do a good job in the base treatment of all steel network flooring

Mondo Technology Updated on 2024-01-29

The base treatment of all-steel network flooring is an important part of ensuring the quality and performance of floor installation. Here are some basic grassroots processing steps:1Clean the floor: Before installing the web floor, the floor needs to be cleaned thoroughly. Remove dust, oil, mud, water and other debris from the ground to ensure that the ground is clean. It can be cleaned using cleaning tools such as vacuum cleaners, mops, damp cloths, etc.

2.Leveling and trimming: Check whether the ground is flat and whether there are uneven places. If there are sunken or raised parts of the floor, they need to be trimmed. Use cement mortar or self-leveling ground material to fill in the recesses, and use sand or shovel to trim the convex areas to level the ground.

3.Moisture-proof treatment: If the ground is wet, moisture-proof measures need to be taken. A vapor barrier can be applied to cover the floor with a moisture barrier film or moisture barrier paint to prevent moisture from the bottom of the floor.

4.Anti-corrosion treatment: If the ground is susceptible to corrosion, anti-corrosion treatment can be considered. Apply anti-corrosive paint or cover the floor with anti-corrosive material to prevent the floor from corroding.

5.Check the wires and cables: Before proceeding with the floor installation, you need to carefully inspect the direction and connections of the wires and cables on the ground. Ensure the safety and reasonable layout of wires and cables to avoid damage to wires and cables during floor installation.

6.Installation according to specifications: Installation according to the specifications and installation requirements of all-steel network flooring. Assemble the floor module on the ground according to the specified construction method to ensure a stable installation.

It should be noted that for the base treatment of all-steel network flooring, the specific steps and measures may vary depending on the region, site and other conditions. It is recommended to read the installation instructions and recommendations provided by the manufacturer of the flooring product carefully before proceeding with the base treatment to ensure proper operation and optimal results.