One brick and one tile, one pipe and one line, just for quality!

Mondo Social Updated on 2024-01-30

Sampling location]: Twin Towers Mansion.

Construction Update]: Oil workers are under construction.

Scrape the caulking plaster at the top gypsum board splicing.

The grooves in the wall are filled with high-strength plaster.

Scrape the plaster for rough leveling.

Oilman is a very common project in decoration, the same, they are also one of the most important processes in the decoration, oilers are often in the late stage of construction in the home decoration, this stage of the work is also very important, including but not limited to hanging the ceiling forward, coating the nail hole with anti-rust paint, filling the wall groove and hanging the net, etc., no detail is crucial.

Sampling location]: Wutong Temple.

Construction Update]: Mid-term acceptance.

Tile yin and yang angle detection: use the yin and yang angle detector to detect, the kitchen and bathroom wall tiles are square at all corners, and the error is not more than 2mm.

Tile flatness inspection: the overall flatness of the tile is measured with a 2-meter ruler, and the 2-meter ruler is less than or equal to 15mm error, the flatness of adjacent tiles differs by 05mm。

Sampling location]: Provincial Song Dormitory.

Construction Update]: Final acceptance.

The wall latex paint can not have trachoma, the color is uniform, and there is no falling.

The color separation line is clear and there is no bending.

The yin angle is straight, and the yang angle is vertical. The wall putty needs to be scraped from the ground with a straight baseboard.

The top surface of the wall is flat, and there is no obvious concave and convex phenomenon.

Regularly inspect the situation of each construction site, is responsible for the owner, the site inspection is never a formality, but really implemented, so that the construction quality is more standardized and safe!

Related Pages