How much does it cost to renovate a 98 square meter house?

Mondo Home Updated on 2024-01-28

Decorating a house is a very complicated thing, which consumes the owner's time and energy, and it is also expensive to decorate it.

If you have friends who don't know about decoration, I recommend you to use:

"Crayon Decoration Calculator".wxMini programs

Enter City + House Area + Style

YesOne-click free access to the list of decoration** and different styles** in the same city.

It is convenient for everyone to take the list to inspect and compare, choose well, and the decoration is worry-free.

There is still a chanceReceive a 5,000 yuan red envelopeThere is a subsidy for decoration, so you don't have to worry about home decoration.

1. Semi-packaged repair: 400-600 yuan square meters

The owner is responsible for buying the main materials, and the accessories and construction are handed over to the decoration company or construction team, which can effectively control the budget, which is more suitable for the owners who understand the decoration and have free time.

2. Full package repair: 1200-1500 square meters

It means that the design, construction, main materials and auxiliary materials are contracted by the decoration company, and the owner only needs to do a good job in the early stage of design communication, budget control, and later supervision and acceptance.

1. Hydropower and bricklayer are the first to start, and the decoration time generally takes about 20-25 days.

The water and electricity decoration is about 4-10 days, the waterproof construction is about 3-7 days, and the bricklayer decoration is about 10 days.

2. At the same time of water and electricity decoration, carpentry is also carried out at the same time, and it takes about 15-20 days for wood, such as frame wood production, finishing, closing, etc., which generally takes about 10-20 days.

3. The next step is oil construction, which generally takes about 10-15 days, such as priming, topcoat, wall scraping putty and brushing latex paint.

4. Finally, the installation of the wooden doors in each room, at this time, there is also the installation of floors, cabinets, lamps, sanitary ware and other furniture, which takes about 4-6 days.

I hope the above content can give you some reference help.

Like it, don't get lost in decoration!

How much does it cost to renovate