Jingchu Network (Hubei ** Network) News (Reporter Duan Han Correspondent Chen Yuhang) "It began to snow in the front and rear sections of the Xuanhe Expressway Watershed Tunnel, and emergency personnel, machines, and materials should be dispatched immediately. "On the evening of December 15, near the Xuanhe Expressway Watershed Tunnel at an altitude of nearly 1,300 meters, a snowstorm quietly arrived at night. Hubei Jiaotou Northwest Hubei Expressway Operation and Management *** hereinafter referred to as West Hubei Operating Company) responded quickly and dispatched urgently, and launched the emergency response plan for low temperature ice and snow weather as soon as possible.
Planning, decision-making and deployment are not relaxed.
In order to effectively do a good job in the winter anti-freezing and anti-skid safety emergency work, since mid-October, the West Hubei Operating Company has successively organized and held the 2023 Winter Snow Removal and Anti-skid Work Deployment Meeting, the Severe Weather Emergency Linkage Disposal Work Joint Meeting, and the Fourth Safety Committee (Enlarged) Meeting in 2023, formulated and issued the "2023-2024 Highway Severe Weather Emergency Response Work Plan of the West Hubei Operation Company", and jointly carried out special inspection and acceptance of emergency materials with high police, road administration, maintenance and other units. Safety education and technical training, anti-ice and snow removal "review", winter traffic accident emergency drills, etc., while increasing the monitoring of road network operation, strengthening the joint inspection and control mechanism, with practical practice and practical results.
On November 22, the Western Hubei Operating Company held a joint meeting on the emergency response to severe weather on the expressway in 2023-2024.
The operating company in western Hubei attaches great importance to the emergency response work of bad weather, strictly implements the whole link deployment of "before, during and after the snow", and combines the characteristics of the terrain and traffic flow of different sections of the expressway under its jurisdiction, and establishes an emergency disposal information database, including 14 emergency teams and emergency points, and the setting of 18 key work sections, and at the same time in 84 icy road sections and long steep slope sections. Signs and thermometers to ensure that manpower and material resources are sufficient, closely watched, and adjusted quickly.
Breaking through the snow and keeping the security guard.
Action is the most efficient deicing agent!The emergency commando team is on the road!"Before the first snowflake landed on the land of western Hubei Province, the five comprehensive inspection offices of the western Hubei operating company had already been equipped on the road, checking the temperature of icy road sections such as sharp bends, steep slopes, bridges, tunnel entrances and exits along the line, and carrying out preventive spreading operations against the "information base".
At 18:32 on December 15, heavy snow arrived as scheduled, and some sections of Xuanhe Expressway, Liwan Expressway and Shanghai-Chongqing Expressway under the jurisdiction of the company appeared snowy in a short period of time and continued to increase. The operating company in western Hubei quickly entered the "wartime" state, and issued prompt information on the variable information board and tunnel broadcasting platforms along the line for the first time, and adhered to the working principle of "prevention first, rapid snow removal, heavy vehicle rolling, timely obstacle removal, load and speed limit, and scientific scheduling" Warm Road".
Reserves of snowmelt materials and equipment in Liwan work area.
Facing the snow, the sincere service does not close.
While carrying out the snow removal and smooth operation with all its might, the western Hubei operating company did not forget to build a "warm barrier" for the masses. The volunteer teams of the company's stations have been dispatched, using snow shovels, brooms, shovels and other tools to focus on cleaning the snow in the toll plaza and toll lane, and do a good job of driving steadily and slowly prompting each vehicle to ensure traffic safety. Actively do a good job in extending services, build a convenient service desk, do a good job of comforting and explaining to the long-distance drivers and passengers stranded in the square, and at the same time provide emergency medicines, instant noodles, hot water, power banks and other intimate items, and win the satisfaction of past drivers and passengers with attitude, speed and temperature.
As of 8 o'clock on December 18, a total of 188 emergency personnel, 60 emergency vehicles, 67 mechanical equipment, and 298 tons of snow melting agent were consumed in 6 high-speed 550-kilometer sections under the jurisdiction of the western Hubei operating company. The traffic of the road under the jurisdiction of this round of snowfall is normal, no traffic safety accidents have occurred, and passing vehicles have been safely guided off the station.