GC2023-004 Plot Headquarters Base Project, Fengshan County Detention Center and Armed Police Squadron New Project, Electronic Information Industrial Park Project, Red Beautiful Village Construction Project.
Here are the details of the project
GC2023-004 Plot ABP Project
First, the industryepc
Second, the tenderee:Railway Construction and Urban Development (Nanning) Urban Development***3. The total investment of the project:1.400 million yuanFourth, the project overview:This project is the headquarters base project of GC2023-004 plot in Nanning City, and the construction site is located on the east side of the South Square of Nanning East Railway Station, Guangxi Zhuang Autonomous Region. Construction scale: 31,329 above-ground construction area04 square meters, underground construction area 800304 square meters, with a total construction area of 39,33208 sq.m. 1 commercial office building with 23 floors above ground.
Total construction period: 680 calendar days.
Scope of bidding: construction drawing design, procurement, construction of the project (all engineering construction within the scope shown in the construction drawings (except for those specifically stated in the bidding documents), including: earthwork, foundation pit support engineering, foundation engineering, construction, decoration, civil air defense, waterproofing, insulation, doors and windows, railings, façade decoration, public parts hardcover, water supply, drainage, rainwater, electrical power lighting, lightning protection and grounding, intelligent and safety measures, as well as elevators, floodlighting, outdoor municipal, garden and other professional subcontracting projects, special ** and other projects) until the completion of acceptance, filing and overall handover, defect repair and warranty work during the project warranty period.
5. Deadline for submission of bidding documents:2024-01-12 09:30
VI. **Inquiry**:Info**:Recruiting nets.
Fengshan County Detention Center and Armed Police Squadron New Construction Project
First, the industryepc
Second, the tenderee:Fengshan County Public Security Bureau3. The total investment of the project:11399.960,000 yuanFourth, the project overview:This project is a new project of Fengshan County Detention Center and Armed Police Squadron, and the construction site is located in the planning land plot of the original ecological octagonal processing and production base in Hengli Village, Fengcheng Town, south of Fengshan County, about 4 kilometers away from the county, west of S208 Provincial Highway, about 280 meters away from S208 Provincial Highway, and about 200 meters away from Fengshan County Stone Railing Factory. Construction scale: total construction area of 1415497 square meters (building capacity area 13238.)06 square meters, the building does not count the volume area of 91691 sq.m.). Among them: the construction area of the detention center is 815425 square meters (including 5,727 rooms for detainees.)37 square meters, case handling and management room 208892 square meters, ancillary room 26596 square meters, 72 armed police duty rooms00 square meters), the barracks of the armed police squadron 147761 square meters (738 common rooms.)78 square meters, 711 living rooms84 square meters, 26 duty rooms99 square meters), the construction area of the supervision center is 360620 square meters (711871 square meters of supervision center, detention center and armed police squadron accounted for 5066%, area 360620 square meters, respectively for case handling and management of 66852 square meters, 2080 police office and living space19 square meters, 341 rooms for the procuratorate and the court31 square meters, 454 ancillary rooms16 square meters, 62 rooms for armed police duty02 sq.m.), 91691 square meters (excluding capacity). The main construction content includes the main construction project, decoration engineering, water supply and drainage engineering, electrical engineering, intelligent engineering, fire protection engineering, supporting construction roads, parking lots, training grounds and greening, fences, slope protection and retaining walls and other ancillary facilities.
Duration: 419 calendar days.
5. Deadline for submission of bidding documents:2024-01-12 09:00
VI. **Inquiry**:Info**:Recruiting nets.
Electronic information industrial park project
First, the industryepc
Second, the tenderee:Anhui industry and finance environmental protection project3. The total investment of the project:4.600 million yuanFourth, the project overview:This project is the EPC (Phase II) project of the Electronic Information Industrial Park of Bengbu High-tech Zone, which is located in Bengbu High-tech Zone, east to Changzheng South Road, north to Jianggu Road, west to Q12 Road, and south to Qianhe Road. With a total construction area of about 110,000 square meters, the project is a general contracting project, mainly building 6 production workshops, 1 shift dormitory, 1 storage room, including but not limited to outdoor roads, indoor and outdoor decoration, fences, lighting, lighting, integrated pipeline network corridors in the field, indoor and outdoor intelligence, landscaping, water, electricity, steam, gas, photovoltaics, etc., as well as basic supporting facilities within the scope of the land.
View Details5. Deadline for submission of bidding documents:09:00 on January 2, 2024
VI. **Inquiry**:Info**:Recruiting nets.
Red Beautiful Village Construction Project
First, the industryepc
Second, the tenderee:The people of Wufeng Town, Zhangwu County**3. The total investment of the project:553.550,000 yuanFourth, the project overview:This project is the red beautiful village construction project of Gaoshantai Village, Wufeng Town, Zhangwu County, covering an area of 5,000 square meters, with a new red exhibition hall with a construction area of 1,080 square meters and a temporary combat headquarters with a construction area of 624 sq.m.;The construction of 3,820 meters of antique stone walls along the street, 7,800 square meters of hardening of the road shoulder and in front of the door, 400 square meters of red theme sculpture paintings on the wall, the construction of a red theme cultural square, 1,830 square meters of square hardening, 21 meters of Liberation War theme cultural corridor, 1 Liberation War theme sculpture, 4 groups of landscape lights;Construction of 7 sculptures and signs along the 101 Road to the exhibition hall;Construction of 1,500 square meters of parking lot outside the exhibition hall;And supporting the construction of water supply and drainage, electrical, HVAC, fire protection, greening, etc.
5. Deadline for submission of bidding documents:
VI. **Inquiry**:Info**:Recruiting nets.