Machinery and equipment man hour management, holding the bull s nose of cost management

Mondo Three rural Updated on 2024-01-28

For an engineering project, quality, safety and progress are very important, and they are the basic guarantee for project delivery

From the perspective of business management, cost management should also be very concerned, and it is more profitable to undertake a project.

The bulk of the cost items are materials, machinery, and labor, of which the cost of machinery accounts for about 10%, and the cost of machinery is directly related to mechanical working hours.

How to manage the working hours of machinery and equipment?

For a variety of reasons, although the machinery comes with its own timesheet, the project team manages the hours themselves. The traditional method is on-site manual management, where the constructor or equipment manager arranges the mechanical construction and records the mechanical working hours.

The usual practice is to prepare a paper working hours record sheet, register once in the morning, register once in the afternoon, sign the machine operator, sign the on-site management personnel, and the working hours of the day are registered and confirmed.

The problem of such extensive management is obvious:

1. Large error in working hours

Due to the construction cooperation, the morning period may work for 1 hour, stop for 20 minutes, work for another hour, stop for 30 minutes, will it be directly recorded for 3 hours? Paper documents, manual registration, it is impossible to keep an eye on the machine, and it is impossible to record the process of mechanical work, shutdown and idle in detail. The error in man-hours will be relatively large.

2. Working hours may be falsely reported

The operator signs, the on-site management personnel sign, the timesheet is confirmed, and the company has to pay the fee. As long as the two cooperate, it is difficult for the company to find out if a small amount of false working hours are reported every day. Moreover, even if an abnormality is found during the statistical summary, it cannot be retrospectively reviewed, and it becomes a confused account.

3. It is difficult to calculate the exchange

Even if a machine has a timesheet a day, there are 5 machines to work, and there are 150 pieces in a month, the workload of the exchange is very large. Moreover, the machinery may be different, the monthly leasing method may be different, and the leasing may be different, and it is more difficult to distinguish statistical accounting.

The application of the "mechanical working hours" Internet of Things intelligent system, the problem is solved!

Smart devicesReal-time monitoringMechanical working status, management backgroundReal-time renderingData. The on-site management personnel are freed up and only need to focus on construction coordinationThe statistics of working hours are accurate, the loophole of false reporting of working hours is blocked, and even idle working hours can be identified and recordedData reports are automatically generated in real time, and statistical settlement is also simplified.

The application of intelligent system can effectively save labor costs, avoid the cost loophole of false reporting of working hours, improve the efficiency of statistical settlement, and control the overall cost of the enterprise.