The installation process of vertical explosion-proof vibration motor includes the following steps:
1.Determine the installation position of the motor: First of all, you need to determine the installation position of the motor to ensure that the motor can be stably installed on the ground and will not be affected by the external environment.
2.Install the motor base: Install the motor base in the installation position, make sure that the base is in good contact with the ground and can bear the weight of the motor.
3.Install the motor bracket: Install the motor bracket on the motor base, make sure that the bracket is firmly connected to the motor base and can support the weight of the motor.
4.Install the motor: Install the motor on the motor bracket to ensure that the motor is firmly connected to the bracket and can work normally.
5.Connect the power supply: Connect the power cord to the motor, make sure that the power cord is firmly connected to the motor, and the power can be supplied normally.
6.Install the protective cover: Install the protective cover on the motor to ensure that the protective cover can protect the motor from the external environment and can prevent personnel from touching the motor.
7.Conduct a test: After the installation is complete, a test needs to be carried out to ensure that the motor is working properly and that there are no issues.
8.Installation Completed: After the test is completed, the installation of the motor is completed and can start normal use.