How to make integrated sewage treatment equipment in concrete pool?Guangxi water treatment

Mondo Social Updated on 2024-01-30

A brief description of the integrated sewage treatment equipment for the production of concrete pools:

Design and planning: First, determine the size, shape and layout of the equipment according to the actual wastewater treatment needs. You can consult a professional or refer to relevant materials to ensure that the design is reasonable.

Choice of material: Concrete is a commonly used material that is suitable for making pools. In addition, it is necessary to choose the right impermeable material to ensure the tightness of the pool.

Trenching and foundation treatment: Dig out a suitable size trench according to the design drawings, and then carry out foundation treatment, such as laying a sand and gravel foundation, to ensure the stability of the pool.

Erection of concrete structure: According to the design drawings, the frame of the concrete pool is erected. Reinforced concrete or other suitable structures can be used.

Coated waterproofing layer: A waterproof layer is applied to the surface of the concrete to prevent moisture penetration. Waterproof materials such as polyurethane and waterproof mortar can be selected.

Filling impermeable materials: Fill the inside of the concrete pool with impermeable materials, such as bentonite, waterproof mortar, etc. Make sure the filling is dense to reduce the risk of leakage.

Installation of sewage treatment equipment: According to the design drawings, install integrated sewage treatment equipment. This may include water pumps, aeration equipment, biofilters, etc.

Connecting pipes and electrical equipment: Connecting inlet and outlet pipes, as well as power lines. Ensure that the pipe connections are sealed and the electrical equipment meets safety requirements.

Commissioning and testing: After the installation of the equipment is completed, debugging and testing are carried out to ensure the normal operation of the equipment. Commissioning may require a professional.

Acceptance and operation: Acceptance is carried out after ensuring that the equipment is operating properly and that the expected treatment effect is achieved. After passing the acceptance, the official operation will begin.

Please note that the steps provided here are for reference only and the specific production process may vary depending on the actual situation. If in doubt, please feel free to ask me.