In order to meet the coal demand of power generation and heating enterprises in Jilin Province, the Shenyang Bureau of China Railway has done a solid job in ensuring the supply of thermal coal to ensure that the people are warm in winter.
Datang Changchun No. 2 Thermal Power Co., Ltd. is one of the largest heating enterprises in Jilin Province, and undertakes the important task of normal production and operation of enterprises in Changchun urban area and residential electricity heating. After entering the winter, the demand for coal used by enterprises has increased significantly, and 230 vehicles are consumed every dayAbout 60,000 tons of coal. In view of the actual arrival of coal concentration in enterprises, the railway department has opened a green channel to provide transportation capacity support in a timely manner to ensure the transportation demand of enterprises during peak coal hours.
Since the beginning of winter, the Shenyang Bureau of China Railway and the Jilin Provincial Department of Industry and Information Technology have established a coordination and linkage mechanism, actively contacted the upstream and downstream enterprises of coal mines and power plants, coordinated the transportation of coal in eastern Inner Mongolia, closely tracked the coal storage and consumption of direct power plants in the province, and monitored the inventory structure, installed capacity, daily consumption tonnage and consumable days in real time. In view of the coal demand of power plants, in accordance with the "five priorities" principle of "priority acceptance, priority air distribution, priority loading, priority release, and priority unloading", to ensure the safe and smooth transportation of thermal coal.
Xiaohelong Station is located in Kuancheng District, Changchun City, Jilin Province, and undertakes the transportation of coal for power generation and heating for two power plants: Huaneng Jilin Power Generation Changchun Thermal Power Plant and Guodian Jilin Longhua Changchun Thermal Power Plant. In the past few days, Jilin has entered a continuous low temperature weather, and the cadres and workers of the station are not afraid of the severe cold, stick to their posts, and work 24 hours a day to ensure that the thermal coal train is quickly picked up and delivered, quickly released and quickly compiled, and 30,000 tons of thermal coal are completed every day to receive and unload the task to ensure that the local people are warm in winter.
On the basis of making every effort to smooth the coal transportation channel, the Shenyang Bureau of China Railway has paid close attention to key nodes such as marshalling stations and section stations, scientifically optimized the operation links, compressed the transit stay time of the technical station, and adjusted the operation shifts in stages to accelerate the turnover of traffic flow. From December 1 to December 26, the Shenyang Bureau of China Railway transported 4.7 million tons of thermal coal for Jilin Province, and the average number of days consumed by 19 railway direct power supply plants in Jilin Province reached 23 days, ensuring the stability of thermal coal and production coal for enterprises.