Clean workshop decoration design

Mondo Finance Updated on 2024-01-29

The following aspects need to be considered in the decoration design of the clean workshop:

Selection of decoration materials: The walls, floors and ceilings of the clean workshop need to choose materials with good sealing and corrosion resistance, such as stainless steel plates, aluminum plates, PVC plates, etc. These materials have a smooth, flat surface that is easy to clean and disinfect, and is resistant to dust and bacteria.

Selection of decoration method: The decoration method of wall, floor and ceiling should be seamlessly connected to ensure the sealing of the whole workshop. Walls and ceilings can be suspended ceilings, and floors can be self-leveling cement or epoxy floors. These decoration methods can ensure that the surface of the entire workshop is smooth and flat, easy to clean and disinfect.

Lighting design: Lighting in a clean room should be adequate, but not too much heat and dust. LED luminaires can be used, which have a lower amount of heat and dust generation, while having a longer life and lower maintenance costs.

Air purification system: The air purification system of the clean workshop should meet the national standards, usually requiring to reach 10,000 or 100 levels. Air purification equipment such as HEPA filters and activated carbon filters can be used, which can effectively filter particulate matter and harmful gases in the air to ensure the air cleanliness of the workshop.

Detail design: The doors, windows, pipes, trunking and other details of the clean workshop also need special treatment. For example, doors need to be sealed automatically or inductively, windows need to be double-glazed windows with good sealing, and pipes and trunking need to be made of well-sealed materials and rationally arranged.

In the process of clean workshop decoration design, it is also necessary to take into account the construction period, budget and other factors, select appropriate materials and equipment, and strictly follow the construction plan to ensure that the quality and performance of the clean workshop meet the requirements.

Related Pages