Flashing structure split chamber seam style

Mondo Finance Updated on 2024-01-25

If you want to know more about the flashing structure of the split chamber seam style, it is recommended that you take a look at the following article to have a more in-depth understanding of it.

Flashing structure refers to a waterproofing measure for construction at the junction of the roof and wall of a building. Split joint is a common style of flooding structure, which can effectively prevent water leakage and protect the structure and interior space of the building through reasonable design and construction.

Design principles: 1. Reasonable construction form: The sub-silo joint usually adopts the form of "three tanks and one cover", that is, the collection, discharge and protection of water are taken into account. The trough should be designed to be able to contain and drain rainwater, and the lid should be designed to be flat to avoid water accumulation.

2.Correct selection of materials: The materials of the silo joints should have good weather resistance and corrosion resistance, and be able to resist the erosion of ultraviolet rays, acids and alkalis and other external environments for a long time. Commonly used materials are metal, plastic, rubber, etc.

3.Reasonable drainage design: The drainage design of the sub-silo joint should consider the roof slope of the building, rainfall and other factors to ensure that the rainwater can be discharged smoothly. At the same time, the connection of the drainage system should be firm to avoid water leakage.

Construction method: 1. Clean up the base: Before construction, it is necessary to clean up the debris and dust at the joint of the warehouse to ensure that the base is clean and tidy.

2.Installation of the sub-silo joint material: According to the design requirements, the sub-silo joint material is cut according to a certain size and installed at the required position. Keep the material flat during installation and make sure that the seams between the materials are tight.

3.Sealing treatment: After the installation of the sub-bin joint material is completed, it needs to be sealed. Sealant is usually used for filling to ensure the tightness of the bin seam. The sealant should be made of materials with good weather resistance and strong acid and alkali resistance.

4.Test the drainage performance: After the installation and sealing of the sub-silo joint, the drainage performance test needs to be carried out to detect whether there is water leakage. It can be tested by manual flushing or simulated rainwater.

5.Protective treatment: Carry out protective treatment on the outside of the silo joint to prevent the material from being eroded by the external environment such as ultraviolet rays, acid and alkali. Common methods include applying anti-corrosive paint, installing sunshades, etc.

When designing the style of the sub-warehouse seam, attention should be paid to the reasonable construction form, the selection of appropriate materials, and the installation and treatment in accordance with the correct construction method. In this way, the waterproof effect and service life of the sub-bin joint can be ensured.