The production and processing of highway walls need to take into account the size and weight of the product. According to the conventional production process, the weight of a 1-2 meter cement isolation pier mold is generally about a few hundred kilograms, while the weight of a 4-meter-long large isolation pier mold may reach a ton or even heavier.
In the production process, in addition to the size and weight of the mold, the material requirements of the product also need to be considered. If the customer has special requirements for the material, such as the need to use materials such as high-strength steel or aluminum alloy, then the weight of the mold may be heavier.
In order to meet the customer's requirements for materials, manufacturers need to choose the right materials and processing processes to ensure the durability and stability of the mold. At the same time, it is necessary to pay attention to the transportation and installation of the mold to ensure that the mold can be safely and accurately installed on the highway separation wall.
In summary, the production and processing of highway walls need to take into account the size, weight and material requirements of the product. Manufacturers need to choose the right materials and processing processes according to the needs of customers to ensure the quality and safety of products.