1. Construction preparation
1.Ensure the quality of the material: select high-quality EPS line materials to ensure that the quality of the material is stable and reliable, and meets the relevant standards.
2.Reasonable planning of the site: According to the construction needs, the construction site is reasonably planned to ensure that the materials are stacked in an orderly manner and the construction is convenient.
3.Clarify the division of labor: clarify the responsibilities of each member of the construction team to ensure the smooth and safe construction process.
Second, the construction process
1.Measurement and positioning: According to the design drawings, the EPS line is positioned and measured to ensure that the line installation position is accurate.
2.Foundation treatment: Carry out foundation treatment on the wall surface of the installation line to ensure that the wall surface is smooth, dry, and free of impurities such as oil stains.
3.Install EPS lines: According to the requirements of the design drawings, install the EPS lines in place one by one. During the installation process, attention should be paid to the verticality and flatness of the lines and the natural and beautiful connection between the lines.
4.Fixing and adjusting: Use special nails or adhesives to fix the lines to the wall to ensure stability and reliability. During the installation process, the lines should be adjusted in time to ensure the overall effect between the lines.
5.Finishing layer: The EPS lines are coated according to the requirements to ensure a smooth surface and consistent color.
6.Cleaning and acceptance: clean up the construction site to ensure that the environment is clean and tidy. Acceptance of the completed EPS lines to ensure that the construction quality meets the requirements.
3. Precautions for construction
1.Construction personnel shall strictly abide by the safety operation procedures to ensure construction safety.
2.When installing EPS lines, it is necessary to ensure that the verticality, flatness and connection are natural and beautiful, and avoid misalignment, tilt and other phenomena.
3.When using special nails to fix the line, it is necessary to control the depth of the special nail to avoid damaging the surface of the line.
4.When applying the finishing layer, it is necessary to ensure that the coating is uniform to avoid problems such as color difference and peeling.
5.The construction site should be kept clean and tidy, and the construction materials and tools should be avoided from being piled up indiscriminately, which will affect the construction progress and effect.
The construction of EPS exterior wall decorative lines can not be sloppy, and must be operated in strict accordance with the construction process and precautions to ensure that the construction quality meets the requirements. At the same time, the construction team should pay attention to teamwork, strengthen communication and coordination, and ensure the progress and effect of construction. Only in this way can high-quality EPS façade moulding work be created.