Basic introduction of photovoltaic cement pier mold

Mondo Finance Updated on 2024-01-31

Photovoltaic cement pier mould prefabricated component photovoltaic pier formwork can be divided into two types of steel structure features: integral and prefabricated, and can also be divided into two categories: steel mold and plastic mold. The upper and lower parts of the mold are designed with slopes, which is convenient for the construction personnel to pour and form, and the mold can be directly buckled. The operation is carried out in a prefabricated way, that is, all the photovoltaic piers are manufactured and displayed on the ground on site.

The cost of photovoltaic cement pier mold is low, and it is generally not lower than the market. The first mold is about a few tens of yuan a set, and the cost of photovoltaic pier plastic mold is about three hundred.

Many people will ignore the cleaning of the mold, and it is recommended that the photovoltaic cement pier formwork be cleaned in time after demolding, and it must be thoroughly and comprehensively cleaned, because the residue and waste on the surface of the photovoltaic cement pier formwork have a certain adhesion. Therefore, it is important to take care to thoroughly clean the inner and outer walls of the mold to ensure that there are no residues and waste. After washing, it should usually be left to dry and then stored. It is necessary to maintain the mold regularly, wipe it and brush the oil in time to prevent the mold from rusting. Damaged parts should be disposed of in a timely manner.

Related Pages