The construction and application of the flow groove mold usually refers to the construction and application of the flow groove mold used in the fields of construction, engineering, and roads. The following is the process of general flow groove mold construction and application:
1.Design determination: determine the size, shape and depth of the flow tank according to the specific requirements and design scheme.
2.Install the mold: Install the prefabricated flow tank mold in a predetermined position to ensure the stability and verticality of the mold.
3.Prepare concrete: Prepare concrete suitable for the flow tank according to the concrete ratio to ensure the strength and fluidity of the concrete.
4.Pouring concrete: Pour the prepared concrete into the flow tank mold and gradually fill the entire flow tank. A vibrator can be used to remove air bubbles from the concrete and guarantee the compactness of the concrete.
5.Flat surface: Use a trowel tool to scrape evenly across the concrete surface to achieve the desired flatness.
6.Curing: According to the curing requirements of concrete, the concrete is maintained by means such as water spraying to ensure its normal hardening and strength development.
7.Dismantle the mold: After the concrete is fully hardened, remove the flow tank mold and complete the construction.
The application of flow tank mold is very wide, and common application scenarios include:
Construction works: flow tanks for drainage systems and sewers.
Road construction: used for stormwater drainage of roads or sidewalks.
Channels and water conservancy projects: water flow control and guidance for channels and water conservancy projects.
Industrial facilities: used for the transfer and discharge of liquids in industrial production processes.
In short, the construction and application of the manifold mold is an important technical process, which needs to be operated in accordance with professional requirements and construction processes to ensure the construction quality and use effect.