Factory workshop cost saving plan and improvement, factory workshop to save costs and achieve improvement, the following plans and measures can be considered:
1.Energy management: Optimize the energy efficiency of equipment, adopt energy-saving equipment, rationalize production planning to avoid energy peak hours, and implement energy consumption monitoring.
2.Raw material procurement optimization: Find more competitive raw material suppliers, establish long-term and stable cooperative relations, regularly conduct procurement cost analysis, and reduce raw material costs.
3.Production planning and scheduling: Develop a scientific production plan to avoid waste due to overproduction or underproduction. Adopt advanced scheduling system to improve production efficiency.
4.Human resource optimization: Reasonably arrange the working hours of production personnel to improve their performance and work efficiency. Train employees to improve their skills and reduce labor costs.
5.Equipment maintenance management: Regular equipment maintenance is carried out to prevent downtime and production loss due to equipment failure. Extend the life of your equipment with preventative maintenance.
6.Quality management: Strengthen quality management, reduce the rate of defective products, reduce the rate of scrap, improve product quality, and reduce the cost of rework and returns.
7.Inventory management: Refined inventory management to avoid excessive inventory levels. Reduce inventory carrying costs with modern inventory management methods such as "just in time".
8.Technology upgrading: Introduce advanced production technology and technology to improve production efficiency and reduce production costs. Focus on the application of new technologies such as digitalization and automation.
9.Cost accounting and control: Establish a scientific cost accounting system, accurately calculate various costs, conduct regular cost control analysis, and find out the links with high costs for optimization.
10.Waste Management: Implement waste reduction programs to improve waste utilization** and reduce waste disposal costs.
11.*Chain optimization: Cooperate with first-class merchants and logistics companies to optimize the first-class chain and reduce the expenditure of procurement costs, transportation costs and other links.
12.Employee incentives: Set up an incentive mechanism to encourage employees to put forward cost-saving suggestions, share saving experience, and establish a cost-saving corporate culture.
By taking these plans and improvement measures in a comprehensive manner, the factory floor can achieve effective cost control and reduction without affecting production quality and customer demand, and improve the competitiveness of enterprises.
Learn more about lean production management, welcome to pay attention and leave a message!What else do you want to know?