What is the width of each lane of the standard plastic runway?
What is the width of each lane of the plastic runway?As a leader in the plastic runway construction industry, Shengli Sports has an in-depth understanding and rich experience in this problem. In the planning of the track and field field of the plastic track, the width of each track has its own specific standard. So, what is this standard?
First of all, we should make it clear that the width of each lane is different for different lengths of plastic runways. Taking the 200-meter plastic runway as an example, the total length of the sports field is 200 meters, and the straight line length is 50206 meters with a lane width of 122 meters. Then, the width of each lane of the 200-meter plastic runway is 122 meters. For a 400-meter plastic runway, the circumference of the inner ring is 400 meters, and the radius of the curve should be 365 meters, the straight should be in a north-south direction to avoid the dazzling effects of low sun positions. The curve should have 8 runways, each with a width of 122 meters, the straight has 10 runways.
The IAAF Standard Manual for Athletics Venue Facilities stipulates that the circumference of the inner circle of the standard sports track is 400 meters, of which the radius of the curve should be 365 meters, the straight should be in a north-south direction to avoid the dazzling effect of the sun when the position of the sun is low. The curve should have 8 runways, each with a width of 122 meters, the straight has 10 runways. The safety area on the inside of the runway is not less than 1 meter, and it is best to have a safety area of 1 meter on the outside, with a starting area of at least 3 meters and a sprint buffer section of at least 17 meters. The maximum inclination of the left and right slopes of the track shall not exceed 1:1000, and the downward inclination of the running direction shall not exceed 1:1000.
In general, the width of each lane of a plastic runway is determined by its type and paving standard. During the laying process, the relevant regulations and standards should be strictly adhered to to ensure the compliance of the width of each lane and the entire sports field. At the same time, in the design and construction process, it is also necessary to take into account factors such as the safety and user experience of users to ensure the safety and comfort of the plastic runway.