The installation of the flue gas monitoring system in the fine chimney can be referred to the following steps:
1.Determine the monitoring position: According to the specific situation of the chimney, select the appropriate position for monitoring. In general, the monitoring location should be selected as a representative location in the exhaust port of the flue gas or in the flow path of the flue gas.
2.Installation of monitoring equipment: Install the corresponding monitoring equipment according to the specific requirements of the selected location. These devices typically include flue gas analyzers, gas sensors, data collectors, and corresponding protective devices.
3.Connected devices: Connect monitoring devices with data collectors for real-time data transmission.
4.Commissioning equipment: Debugging the installed monitoring equipment to ensure that they can work properly. This includes calibrating the zero point and span of the device to ensure the accuracy of the data.
5.Install the support structure: Install a support structure for the monitoring equipment so that the equipment can be stably mounted on the chimney.
6.Sealing equipment: Use high-temperature, corrosion-resistant materials to seal the monitoring equipment inside the chimney to prevent smoke leakage or damage to the equipment.
7.Connect power and signal cables: Connect power and signal cables for monitoring devices to make sure they are working properly.
8.Test system: Test the installed flue gas monitoring system to ensure that it is working properly and to measure accurate flue gas data.
9.Maintenance and upkeep: Regularly perform maintenance and maintenance on the flue gas** monitoring system, including cleaning the equipment, replacing sensors, etc., to ensure the normal operation of the system.
The above steps are for reference only, and the specific operation may vary depending on the actual situation. If you need more detailed information or advice, please consult the relevant professionals of Xinze Instruments.