What is the construction method of PVC plastic flooring?

Mondo Home Updated on 2024-01-31

Shaanxi Xi'an Weinan Yanliang Sanyuan Zhouzhi Baoji Xianyang PVC floor construction, underground parking lot floor, epoxy floor engineering, sand mining floor engineering, corundum wear-resistant floor engineering, anti-corrosion floor engineering, acid and alkali resistant floor construction, Shaanxi Donglang construction site floor engineering.

PVC plastic flooring has the functions of anti-slip, moisture-proof, fireproof, etc., so it is used in many public places, so what is the construction method of PVC plastic flooring?Let's find out together!

First, grassroots treatment.

1. After the walls, ceilings, doors and windows are installed, clean up the debris on the ground.

2. Remove oil stains and residues on the ground.

3. Clean up the dust and sand on the ground.

4. After the ground is cleaned, evenly roll the interface agent.

Second, self-leveling construction.

1. Check whether the cement self-leveling meets the standard, and do not use expired self-leveling.

2. Pour the self-leveling into the dissolver and dilute the self-leveling with water.

3. Stir thoroughly until it becomes a fluid.

4. Pour the self-leveling on the ground and scrape it flat with a rake tooth scraper, with a thickness of about 2-3mm.

5. Within 4 hours after the completion of self-leveling construction, people can not be put on and stack items.

3. Pay-off. 1. According to the design pattern, floor specifications, and room area, the grid and elastic line positioning are carried out.

2. Pop up the center reticle and parquet block line on the ground.

3. Pop up the edge line on the wall, pay attention to the line to be thin and accurate.

4. Before the floor is paved, the board is numbered according to the line pre-assembly.

Fourth, floor installation.

1. Wipe the ground with a dry towel to remove dust.

2. Brush the paste on the surface with a toothed scraper, pave the plate from the inside to the outside, and press it with a roller or push plate after paving.

3. After the plate is laid, wait for the adhesive to solidify, and then weld the plate seam.

4. Before welding, cut the edges of the two adjacent plates into V-shaped grooves, and then weld the welding rod with a hot air welding gun.

5. After the electrode is cooled, use a shovel to cut the electrode higher than the plate surface, and the floor surface can not be damaged during operation.