Text: Liang Yitao, Fan Yuqing, Correspondent: Zhao Zhuojun, Picture provided by Correspondent.
Hello, my side is Qingyun Street in Tianhe, my door is flooded again, the sewage is overflowing, the smell is very big, can you help us solve it?Miss Yu, a citizen, called 12345 for help in the early morning of December 15, and Guangzhou Water Investment and Drainage Company quickly rushed to the scene after receiving the report. After on-site investigation, Miss Yu's house is located in an urban village in Chebei Street, the surrounding buildings are relatively dense and the environment is complex, and the interval between Miss Yu's house and the next building is less than 50 cm, the drainage pipe is not connected to the main street main, the water consumption of residents is increasing day by day, the drainage pipe diameter of the building is narrow, easy to block, and the sewage flows out of the road.
We also contacted us to help clean up the street before, we arranged two dredging on the 29th of last month and the 4th of this month, when the overflow was under control, but I didn't expect it to be blocked again in just two weeks. The person in charge of the Guangzhou Water Investment and Drainage Company said.
In order to solve the problem from the root, completely solve the problems of the citizens, and improve the living environment of the residents in the urban villages, Guangzhou Water Investment and Drainage Company organized multiple departments to conduct on-site research and analysis, and decided to add a drainage well at the alley in front of Miss Yu's building, and connect the building sewage pipe to the main street sewage pipe, so as to share the pressure of the building sewage pipe, and at the same time, arrange sewage suction trucks to clean and absorb sewage again to eliminate the hidden danger of building flooding.
At 20 o'clock on December 16, the increase in drainage wells and sewage suction work was completed, the blocked pipeline was dredged, and the problem of sewage overflow and peculiar smell caused by blockage has been solved. "Thank you very much for your great help in solving the problem so quickly, and thank you for coming to help us deal with the problem in the winter. Miss Yu said.
For a long time, Guangzhou Water Investment and Drainage Company has been adhering to the four-degree work method of stressing temperature, maintaining speed, strength and building a system, and is anxious about the people's needs and solves the people's worries. With the goal of "doing a good job in external services and improving the quality of life of residents within the jurisdiction", we are committed to responding to the needs of the masses with better and faster services and enhancing the sense of gain and happiness of the masses.