Sample contract for the supply of external wall insulation

Mondo Social Updated on 2024-01-30

Contracting unit:

Contractor:

According to the "Economic Contract Law of the People's Republic of China" and the relevant provisions of Fujian Province on capital construction and construction management, Party A and Party B have agreed that Party A will entrust the contractor to Party B, and in order to clarify the rights, obligations and responsibilities of both parties, the following terms of agreement have been reached through negotiation, so that both parties can abide by and implement them.

First, the general situation of the project: the form of contracting and the basis of construction.

Engineering Projects:

Use Brands:

Scope of the project: 25mm vitrified particle bead insulation slurry for the external wall insulation system project - plastering polymer anti-cracking mortar - pressing into alkali-resistant mesh cloth - wiping anti-cracking mortar. The specific content and scope are subject to the design drawings of the internal insulation system of the external wall of the building.

Contracting form: The project adopts the contracting method of contracting.

Construction basis: This contract and construction drawings, the current construction specifications, operating procedures, acceptance evaluation standards and engineering change notices are the construction basis of this project.

Second, the construction period:

1. After the contract is signed, the specific start date shall be subject to the start date confirmed in writing by both Party A and Party B.

2. If there are special circumstances (irresistible factors of manpower) or due to the delay of Party A, the construction period of Party B can be extended.

Third, the cost of the project:

The total cost of the project is about: yuan.

Fourth, the settlement method.

1. Party B contracts the construction of Party A's external wall insulation system project, and the contract price is based on RMB square (calculated according to the actual development area).

2. The engineering quantity includes insulation series materials, labor wage costs, testing costs, and taxes.

1.Article 5 of this contract project contract price includes but is not limited to all materials, equipment costs, machinery, freight, all kinds of taxes payable, handling costs, wages, installation fees, general expenses, profits, insurance premiums, management fees, warranty fees, project inspection and inspection fees, as well as all expenses and expenses to be paid for the test of this project and other costs and expenses related to the performance of this contract; 2.The total price of the project under this contract is fixed, and Party B shall not request adjustment for any reason and in any way, including the rise and fall of the materials, products and equipment required for the project, or the increase in the wage rate and other costs related to the construction of this contract, and shall not require the adjustment of the project price or request additional compensation for the reasons of not fully understanding the factors that increase the cost. )

5. Payment Methods.

1. After the contract is signed, Party A shall pay 80% of the cost of the completed project to Party B within ten days of labor and materials entering the site as the payment for materials.

2. The construction site is under normal construction, and Party A pays Party B 80% of the progress payment for the completed project in the current month.

3. After the acceptance of the energy-saving division of the project is all qualified, the settlement submitted by Party B shall be reviewed by Party A within 30 days after paying 15% of the total cost of Party B's project quantity.

4. After the completion and acceptance are passed, the balance shall be paid within one year.

5. If Party A fails to pay according to the payment method agreed by Party A and Party B, Party B has the right to stop the construction of the project, and Party B will not be liable for the losses caused thereby.

6. Work of Party A and Party B:

1. Party A's work:

a. Provide water, electricity, job site, etc., warehouse, interior wall scaffolding materials, mortar machines, construction elevators, etc. for Party B's use.

b. Provide relevant drawings and information and remove obstacles on the construction site.

c. Responsible for supervising the progress and quality of the project and applying for visas.

d. Allocate the project money according to the provisions of the contract, handle the completion settlement, and organize the completion acceptance of the project.

2. Party B's work:

a. After entering the site, the construction personnel shall carry out construction according to the construction safety operation specifications, and obey the command of Party A's full-time safety personnel.

b. Prepare the construction organization design, make construction preparations and reasonable deployment of construction machinery and tools.

c. Do a good job in the procurement, management and management of materials according to the provisions of the contract.

d. Carry out construction in strict accordance with the construction drawings and operating procedures to ensure the quality and progress of the project.

e. Responsible for the testing and testing of related materials, acceptance data and finished products of the external wall insulation system. f.In strict accordance with the relevant safety technical measures and plans in the construction organization design, special construction plan or work instructions, put an end to illegal command, illegal operation and mechanical sick operation, and assume all responsibility for safety accidents caused by illegal and illegal operations

7. Project quality and completion acceptance.

1. Project quality: The quality requirements of the project are qualified.

2. The project acceptance is based on the construction drawings and specifications, the construction acceptance specifications and quality acceptance standards issued by the state. Party B is responsible for the collection, sorting, review and archiving of the original data and inspection data.

3. According to the needs of on-site construction, it can be accepted in stages.

4. Party B is responsible for all the testing and acceptance costs of the sub-division project, and ensures that it is qualified to pass the acceptance of the distribution.

8. Other matters.

1. This contract shall come into force after the signature and seal of both parties, and shall come into force after the performance of all the terms of the contract.

2. This contract shall be executed in duplicate, one copy for each party A and B, and shall have the same legal effect.

Party A (official seal): Party B (official seal):

Legal Representative (Signature): Legal Representative (Signature):

YYYYYYYYYYYYYYYYYYYYYYYYYYYYY