The development of the remaining cable material on the construction site can promote the development of the relevant industrial chain, how much is a pound of residual waste cable on the construction site, improve social and economic benefits, and at the same time, the use of residual cable materials in power construction can also drive employment, there are **cable friends (click on the avatar, view**Contact us) The remaining cable (half disc half shaft) cable ** how much is a meter, create more employment opportunities for the society, with the continuous advancement of construction projects, the remaining cable tailings in construction site construction The problem of utilization is also becoming increasingly prominent, the remaining new (whole shaft) cable on the construction site is how much is a meter, in the future, through the increase of technological innovation and management efforts, the remaining (into a shaft) cable on the construction site how much is a meter, improve the level of utilization of the remaining cable tailings in the project, such as the promotion and application of advanced technical equipment, the remaining inventory of the construction site backlog of cables to strengthen supervision, improve the rate and efficiency.
The following measures can be taken for the utilization of the remaining cables in the construction site
1.Choose high-quality cables:
In the construction process, it is recommended to choose cable products with guaranteed quality, and the remaining amount of new shafted semi-finished cables on the site to avoid damage and abandonment of cables due to quality problems.
This not only helps to reduce the generation of surplus cables, but also improves the quality of the project and the efficiency of construction.
2.Reasonable wiring planning during construction:
In the construction process, the wiring path of the cable should be reasonably planned to avoid excessive length or overlapping use of the cable, and reduce the generation of remaining cables.
Reasonable wiring planning not only saves the use of cables, but also contributes to the cleanliness of the construction site and the improvement of construction efficiency.
3.Clean and ** remaining cables regularly:
During the construction process, it is necessary to regularly clean and ** the remaining cables.
These remaining cables can be sorted, collected and stored separately for later use.
At the same time, the remaining cables can be considered for reprocessing, and the metal conductors and insulating materials can be separated for better utilization.