At 1:15 on December 9, the 88372 special cargo train, which was marshalled 28 and loaded with 224 Volvo commodity cars, was sent from Ranghu Road Station of Daqing Train Depot of China Railway Harbin Bureau Group to Longtan Station of Shanghai Bureau Group. Since the beginning of the year, they have shipped a total of 80 Volvo commercial cars and 17,760 units to Daqing Volvo Car Manufacturing Company, helping the company's cars to continue to seize the domestic and foreign markets.
Since November, Volvo cars produced by Daqing Volvo Car Manufacturing Company have been favored in Shanghai, Beijing and other domestic markets, and the sales enthusiasm has continued unabated, and orders from overseas markets have also continued to increase, and the demand for railway transportation has been increasing.
In order to help enterprises seize the domestic and foreign markets, Daqing Railway Depot accurately serves enterprises and assists them in solving various problems in railway transportation. The freight marketing sub-center visited Volvo Car Manufacturing Company, and after several rounds of negotiations, the company increased the railway shipment volume to Beitang West Station of Beijing Bureau and Longtan Station of Shanghai Bureau. At the same time, the sub-center took the initiative to connect with the Harbin Branch of China Railway Special Cargo Flow Co., Ltd. to coordinate and solve the special vehicle security problem required for the shipment of cars.
Ranghu Road Station and the subordinate branches of China Railway Special Cargo Flow Company worked together to make full use of the empty space in the freight yard, idle freight platforms and freight warehouses, and expanded the stocking site from the original 5,000 square meters to 6,000 square meters. At the same time, the freight yard is open to logistics enterprises 24 hours a day to ensure that the car barge transportation is unloaded and loaded at any time.
Since November, three heavy snowstorms have fallen in Daqing area of Heilongjiang Province, so that the freight workshop of Hulu Station has organized more than 60 employees to use forklifts, wind snow plows and other machinery and equipment to carry out snow and ice removal operations in the freight yard day and night, so as to ensure that the stocking site, cargo line and freight platform are cleaned up within 6 hours after the snow, and go all out to create conditions for car loading. In November, the station assisted enterprises to ship 1,440 cars in 7 trains, and the shipment volume increased by 74% month-on-month8%, and far more than the same period in history.
In December, the unloading volume of the freight yard of Hulu Station increased suddenly, and the use of the freight line became extremely tight, and the station opened a new line and decided to use the freight yard 4 lines to load cars. They communicated with the public works department to carry out a comprehensive maintenance of the quality of the line, and coordinated with the real estate department to re-repair the platform at the end of the freight line 4 to make the line meet the loading conditions. On December 6, the 4th freight line began to be put into loading cars, effectively alleviating the situation of loading congestion.
In terms of vehicle use guarantee, in order to ensure that the car arrives within the time limit, the station will speed up the distribution of empty vehicles, heavy vehicle adjustment, vehicle marshalling, and give priority to the release of special cargo trains. They also give full play to the advantages of the marshalling station, with 28 or 30 special cargo vehicles as the basic group, and then compile a small number of cargo vehicles in the same direction with the group company, to ensure that the special cargo train is integrated and opened, to ensure that the special train arrives in Beijing within 3 days after hanging, and can arrive in Shanghai and Chengdu on the 7th, so as to win the opportunity for enterprises to seize the market. (China's **Heilongjiang Reporter Station Zhou Huiying).
*: China**Net.