2023 first class cost engineer results query precautions

Mondo Education Updated on 2024-01-28

Before proceeding with the 2023 Level 1 Cost Engineer Result Inquiry, candidates need to know the following precautions::

1. Make sure you have not forgotten the account and password of the Chinese Personnel Examination Network Checking System.

2. It is recommended to know the entrance of the official website and the scoring process in advance.

3. On the day when the test results are announced, there may be an instantaneous influx of too many people, resulting in a situation where the query is full and cannot be entered. This is a normal phenomenon, and it is recommended that you stagger the peak of queries.

4. When checking the results, the scores of some candidates will be displayed as "-1", "2", and "4", where -1 means that they are absent, -2 means that they have violated discipline, and -4 means that their results are invalid.

5. If there is any objection to the test results, the candidate shall submit a written review application to the local government within 30 days after the results are announced, and the local personnel will report to the examination center of the Ministry of Human Resources and Social Security, and the examination center of the Ministry of Human Resources and Social Security will submit the results to the relevant departments for review, and the results of the review will be fed back to the candidates by the local personnel.

Score inquiry portal.

Level 1 Cost Engineer Result Inquiry Portal**: Chinese Personnel Examination Network (

Candidates only need to log in to the Chinese Personnel Examination Network to enter the score inquiry column, enter the account and password used during registration, and then they can check the test results of Yijian.

Steps to check your scores.

The process of inquiring about the results of the first-level cost engineer is as follows:

1. Open the Chinese Personnel Examination Network, **

2. Click on the score query column on the left to enter the score query page.

3. Enter your account, password, and verification code to log in to the score inquiry system.

4. Select the year and the "first-class cost engineer qualification examination", and click to enter to check the results.

Result inquiry time.

According to the notice on the official website, the 2023 first-class construction results are planned to be announced in early January 2024, but according to the experience of previous years, there are precedents for the results of the first construction to be announced in advance, so it is expected that the first-level cost results in 2023 will be announced in late December

1[.Multiple choice] (2013) The heatstroke prevention and cooling fee used for on-site workers during the construction process belongs to the () in the cost of safe and civilized construction measures.

a.Environmental protection.

b.Civilized construction.

c.Safe construction.

d.Temporary facilities.

Answer]b Analysis] The heatstroke prevention and cooling expenses, electric fans, air conditioners and other equipment and electricity costs used for on-site workers are all civilized construction costs in the cost of safe and civilized construction measures.

2[.Multiple Choice] (2015) According to the current regulations on the composition of construction and installation project items in China, the following statement about the cost of measure projects is correct ().

a.The construction cost of the winter rainy season is the cost of temporary facilities, anti-skid treatment, rain and snow removal and other expenses that increase in the construction of winter and rainy season.

b.The construction drainage and precipitation fee consists of two separate cost items: drainage and precipitation.

c.When the height of the cornice of a single-storey building exceeds 15m, the increase cost of overheight construction can be calculated.

d.The cost of protection of completed works and equipment refers to the costs incurred in taking necessary protection measures for completed projects and equipment before the acceptance of branch projects or structural parts.

Answer]a Analysis] This question examines the composition and calculation of construction and installation project cost items according to the cost formation. P18: Construction drainage and precipitation fees are composed of two separate cost items: well completion and drainage and precipitation. P17: When the height of the cornice of a single-storey building exceeds 20m, and the multi-storey building exceeds 6 floors, the overheight construction increase cost can be calculated. The cost of the completed project and equipment protection fee is the cost incurred in the covering, wrapping, sealing, isolation and other necessary protection measures for the completed project and equipment procurement before the completion and acceptance.

3[.Multiple Choice] (2016) Regarding the calculation of foreign construction and installation costs, the following statement is correct ().

a.The cost of subcontracted works does not include the management fees and profits of subcontracted works.

b.The advance increase fee for materials is included in the management fee.

c.The start-up fee generally includes the site clean-up fee and the post-completion clean-up fee.

d.The cost of construction and installation is measured in the form of a project cost index.

Answer]c Analysis] The subcontracted project cost includes the direct engineering cost, management fee and profit of the subcontracted project, so A is wrong;The advance increase cost of the material is included in the material cost of the direct construction cost, so B is wrong;The start-up fee includes the site clean-up fee and the post-completion clean-up fee, 4[.Multiple choice question] (2010) According to the provisions of the "Specification for the Valuation of Bills of Quantities of Construction Projects" (GB50500-2008), the cost of safe and civilized construction should be accrued in ().

a.Bill of quantities for sub-items.

b.A list of measure items and a price table expressed in the form of a calculation base multiplier rate.

c.List of other items and pricing summary.

d.List of fees and taxes and tariffs.

Answer]b Analysis] The cost of the measure project refers to the cost of technology, life, safety, environmental protection and other aspects incurred in the preparation and construction process of the construction of the construction project in order to complete the construction of the construction project. The measures and the contents contained therein shall follow the current national or industry quantity calculation specifications for various professional projects. Taking the provisions of the "Code for Calculation of Engineering Quantity of Housing Construction and Decoration Engineering" GB50854-2013 as an example, the cost of measures can be summarized into the following items: safety and civilized construction costs, night construction increase fees, secondary handling costs, winter rainy season construction increase fees, large machinery and equipment entry and exit and demolition fees, construction drainage fees, construction precipitation fees, above-ground and underground facilities, temporary protection facilities for buildings, and professional measures fees"item"The cost of safety construction should be included in the list of measure items and the price table expressed in the form of the calculation base multiplier rate.

5[.Multiple choice question] (2013) In the cost composition of foreign construction and installation projects, the contractor does not include and apportionment the unit price when bidding, but needs to be listed separately ().

a.Temporary facility fee.

b.Headquarters management costs.

c.Profit. d.Taxes.

Answer]a Analysis] In many countries, start-up costs are generally listed separately for individual projects in front of the cost of each sub-project. The start-up fee varies depending on the country and the project, but it generally includes the following: (4) Temporary facility fee.