The construction of artificial turf for football stadiums is a complex process that requires precise planning and a high level of technical execution. The following is about the general steps and process science of artificial turf construction of football stadiums:
1.Site Preparation:
Clearing the original site:Remove the original natural turf and soil to ensure a flat surface.
Drainage system:Install a good drainage system to ensure that water can be drained quickly out of the site during rainy days or irrigation to prevent water accumulation.
2.Construction of the ground floor of the site:
Base Layer:A stable foundation is laid, usually using gravel or crushed stone, to provide adequate support and drainage.
Compaction:The base layer is compacted to ensure that it is solid and firm.
3.Artificial turf laying:
Artificial Turf Bottom Layer:A layer of fine-grained filling, such as fine sand or rubber particles, is used to improve the elasticity and comfort of artificial turf.
Artificial turf laying:Lay the artificial turf membrane and make sure it is flat and the edges are aligned. Patching or gluing is often used to ensure consistency on the turf surface.
4.Lawn fixing:
Fixed lawn edges:Use special jigs or adhesives to secure the edge of the lawn and ensure it fits snugly against the field.
Anchoring:Anchoring is carried out at the perimeter or critical points of the site to prevent the artificial turf from moving or loosening.
5.Artificial turf filling:
Filled with particulate matter:Fill artificial turf with fine-grained rubber or sand to improve the stability and elasticity of the turf. This also helps to support the grass and provide a more realistic feel.
6.Artificial Turf Maintenance:
Brushing and trimming:Brush and mow your artificial turf regularly to ensure it has a neat and uniform appearance.
Supplemental filling:Regularly check the condition of the filler as needed to replenish it.
7.Quality Check:
Lawn Appearance:Check the appearance of the artificial turf to make sure there are no visible blemishes.
Drainage effect:Check the effectiveness of the drainage system to ensure that rainwater is removed quickly.
8.Acceptance and use:
Acceptance:Conduct professional acceptance to ensure that the artificial turf meets the design and quality standards.
Put into service:Once accepted, the football field can be put into normal use.
These steps cover the main processes of artificial turf construction on football fields, ensuring that the field is flat, stable and durable. It is important to note that each project may be subject to some adjustments based on specific conditions and requirements. Throughout the construction process, the collaborators worked closely with the professional team to ensure that the final result of the artificial turf met expectations.