Jiang Yong took precautions to ensure that the winter road was zero blocked .

Mondo Culture Updated on 2024-01-30

The staff of the county transportation and highway departments inspected the situation of the S239 peak section affected by the strong cold air.

Red Net Moment News on December 18(Correspondent Ren Zewang Li Runhong) Affected by the strong cold air, there was a cold wave in Jiangyong County and the surrounding areas, with local sleet and a minimum temperature of -05. The county's cold wave has a wide range of influence, severe cooling and strong winds. In the past few days, the transportation and highway departments of Jiangyong County have taken active measures to deal with the impact of cold wave weather on domestic roads and ensure that road traffic is unimpeded in winter.

The staff of the county transportation and highway departments inspected the emergency material reserves of the material reserve point of the S348 Xinpu maintenance station.

Since the beginning of winter, the transportation and highway departments of Jiangyong County have taken the prevention and response to low temperature, rain, snow and freezing bad weather as the top priority of their work, strictly implemented the main responsibility, and carried out the action of "strengthening the foundation and consolidating the foundation" for safe production in winter, increasing the intensity and density of road inspections, strengthening the safety inspection of road sections and bridges such as sharp bends and steep slopes, water and cliffs, shady road sections, and bridges, so as to eliminate all kinds of potential safety hazards in a timely manner, so as to "leave no dead ends in the investigation and no future troubles". At the same time, strengthen information sharing and work consultation with meteorological, traffic police and other departments, and make predictions and analyses on all kinds of disasters that may occur on roads in winter, so as to achieve early warning and early notification, form a "seamless connection", and work together to ensure smoothness. In addition, according to the actual situation of the road, the emergency rescue plan for low temperature, rain, snow and freezing bad weather on the road is improved in a targeted manner, and the reserve materials are reasonably distributed in advance and reasonably, so as to "rather be prepared than used, and unavailable and unprepared". Establish 3 emergency response units, 1 mobile emergency response unit and 1 logistics support unit;It is equipped with 1 excavator, 1 bulldozer and 1 loader, 2 sets of generator sets and mobile lighting equipmentReserve 45 tons of snow melting agent, 280 tons of anti-skid materials, 5,000 woven bags, purchase snow chains, shovels, hoes and a number of safety warning signs to meet the needs of emergency work of winter ice and snow disasters, and go all out to ensure that the winter highway is "zero blocking" to ensure the safety and orderliness of road traffic for the people.

Related Pages