I know that the snow is heavy at night, and I hear the sound of breaking bamboo.
The big one, Sheng also. Today, we usher in a poetic solar term, heavy snow.
With the arrival of "heavy snow", the year of 2023 is approaching, which means that the last round of delivery of the year is about to arrive, coupled with the recent cold and hot temperature is not very stable, which brings great challenges to the front-line operators of the Lemi ** plant.
But the challenge is ahead, no matter what the process, every Lemit person is working hard to ensure that the order is delivered on time with the fullest enthusiasm.
Sheet Metal Department:
Savanini is operating normally, RAS is operating normally, 4 laser cutting machines and several other press brakes have been maintained and can be used normally, although the weather changes have an impact, but the impact is within a controllable range.
Welding Department:
The weather has little impact on the welding department, several welding fume purifiers are operating normally, and the welding work can be carried out normally.
Lead Plate Division:
Several lead plate machines are functioning normally, maintenance has been done, and the warmth measures for the workers have also been taken.
The vigorous development of Lemite is inseparable from the hard work and common struggle of every Lemit person. 2023 is coming to an end, and I hope that all Lemit people can take care of themselves, and escort the smooth delivery of every order with a positive and optimistic attitude while ensuring production and quality.