Lingui cold storage accessories What are the key links that need to be paid attention to in the cons

Mondo Health Updated on 2024-01-30

Lingui cold storage accessories tell you that the key links that need to be paid attention to in the construction of cold storage include:

1.Site selection: The location of cold storage should consider factors such as transportation, electricity, water source, geology and environment, and should be kept away from flammable and explosive places to ensure safety.

2.Layout: The layout of cold storage should be reasonably planned, including the entrance of goods, storage area, processing area, packaging area, delivery area, etc., in addition to the setting of personnel office area, rest area and equipment maintenance area.

3.Design and construction: The design of cold storage should follow the relevant national standards and fully consider the use needs of cold storage. At the same time, an experienced design unit should be selected to ensure the scientificity and practicability of the design scheme. The construction process should be carried out in strict accordance with the design requirements to ensure the quality of construction.

4.Refrigeration equipment and material selection: Refrigeration equipment is the core component of cold storage, and equipment with stable performance, low energy consumption and easy maintenance should be selected. At the same time, the safety of the equipment should be considered to avoid accidents such as leakage. The selection of materials should follow the relevant national standards to ensure the quality and safety of the materials.

5.Thermal insulation performance and tightness: The thermal insulation performance of cold storage is the key factor to ensure the temperature stability of cold storage. Therefore, in the construction process, attention should be paid to the selection of insulation materials and the construction of insulation projects. At the same time, the sealing performance of the cold storage is also an important measure to prevent temperature runaway.

6.Installation, commissioning and acceptance: After the equipment is installed, it is necessary to debug to ensure that the operating status of the equipment and the refrigeration effect meet the design requirements. After the construction of the cold storage is completed, it is necessary to carry out acceptance, and the acceptance process should pay attention to check whether the cold storage meets the design requirements and relevant standards, as well as check the quality and safety of the cold storage.

The above are the key links that need to be paid attention to in the construction of cold storage for your reference. For more information, it is advisable to consult a professional.