System partition wall factory double sided hanging board partition wall installation process

Mondo Home Updated on 2024-01-29

System partition wall is a partition wall material commonly used in public places such as offices, schools, hospitals, etc. It adopts the installation method of double-sided hanging board, which has the characteristics of simple and fast, beautiful and generous. The following will introduce you to the installation process of the Steen system partition wall.

One step, preparation. Before installing a Steen System partition wall, it is first necessary to determine the size and location of the wall and prepare accordingly. Clean the walls and make sure they are clean and tidy and free of dust and debris.

The second step is wiring positioning. According to the design requirements, the wiring positioning is carried out on the wall, the length and width of the partition wall are determined, and the position of the vertical hanging board is marked.

In three steps, install the baffle. First, use an electric drill to punch holes in the wall, and then insert the baffle plate into the hole to fix it. The hanging board is not only a supporting structure connecting the wall and the partition wall panel, but also plays a role in stabilizing the partition wall structure.

In four steps, install the connecting screws. Each partition wall panel has reserved screw holes on both sides, and the next step is to install the connecting screws. Thread the screws into the screw holes and tighten them with a wrench to ensure a secure connection between the partition wall panel and the baffle board.

Five steps, install the partition wall panels. Insert the partition wall panels into the notches on the hanging plate and connect each partition wall panel sequentially until the installation is complete. It should be noted that the horizontal and vertical orientations between the partition wall panels should be neat and consistent to ensure the aesthetics and stability of the partition wall.

Six steps to install the top trim. At the top of the partition wall, install the top decoration, which can not only play the role of aesthetic decoration, but also fix the wall panel and increase the stability of the overall structure.

Seven steps to adjust the position of the partition wall. By adjusting the tightness of the connecting screws, the position and levelness of the partition wall can be adjusted. Make sure the partition wall is vertical, horizontal, and firm on the wall.

Eight steps, fine decoration and decoration. The final step in installing a partition wall is to carry out fine decoration and decoration. Painting, decorating or other decorative work on the partition wall can be carried out according to the actual needs to make it harmonious with the surrounding environment.

It should be noted that the installation of the Steen system partition wall needs to be operated by experienced construction personnel to ensure the quality and effectiveness of the construction. At the same time, when using partition walls, care should be taken to avoid violent collisions and overload use to prolong the service life of partition walls.

The installation process of the system partition wall plant includes preparation, wiring positioning, installation of the baffle board, installation of connecting screws, installation of the partition wall panel, installation of the top trim, adjustment of the position of the partition wall, and fine decoration and decoration. Through reasonable operation and construction, the system partition wall can be installed quickly and beautifully, providing appropriate space separation and convenience for public places.