In the field of electrical engineering in 2024, labor** is essential for estimating project costs. The following is a detailed encyclopedia of electrical engineering labor services, and the quantities are expressed in common units of measurement, and standard labor costs are attached.
1.The complete set of distribution boxes is installed on the floor.
Unit of measurement: units.
Labor cost: 17424 yuan.
2.Soldered copper terminal wire cross-section (within 16mm).
Unit of measurement: 10.
Labor cost: 14$40.
3.Cabinet wiring wire cross-section (2.)within 5mm).
Unit of measurement: 10m
Labor cost: 2400 yuan.
4.Terminalless external wiring25mm²
Unit of measurement: 10.
Labor cost: 1056 yuan.
5.Voltage transformer.
Unit of measurement: units.
Labor cost: 50$40.
6.On-screen assistive devices.
Unit of measure: pcs.
Labor cost: 20$16.
7.Meter installation.
Unit of measure: pcs.
Labor cost: 1680 yuan.
8.Voltmeter.
Unit of measurement: branches.
Labor cost: 4800 yuan.
9.Knife type switch with fuse type.
Unit of measure: pcs.
Labor cost: 6864 yuan.
10.Check the wiring of AC asynchronous motors (power 13kw or less).
Unit of measurement: units.
Labor cost: 12288 yuan.
11.Semi-rigid plastic flame retardant pipe PVC 15
Unit of measurement: 100m
Labor cost: 25632 yuan.
12.Crimped thin-walled electrical steel conduit (KBG pipe) is exposed with KBG20
Unit of measurement: 100m
Labor cost: 50160 yuan.
13.Crimping thin-walled electrical steel conduit (KBG pipe) is exposed with KBG32
Unit of measurement: 100m
Labor cost: 52848 yuan.
14.The welded steel pipe is concealed with SC15
Unit of measurement: 100m
Labor cost: 32400 yuan.
15.Install the junction box.
Unit of measurement: 10.
Labor cost: 3264 yuan.
16.Steel trough bridge (width + height 150mm or less).
Unit of measurement: 10m
Labor cost: 9168 yuan.
17.Bridge support frame.
Unit of measurement: 100kg
Labor cost: 28224 yuan.
In order to complete an electrical engineering project, the above labor costs need to be calculated according to the actual engineering quantity. Project managers can make a preliminary labor cost estimate through this encyclopedia and provide customers with detailed orders. When carrying out quantity surveys, it should be ensured that they are accurate to avoid incurring additional costs during project execution. At the same time, this encyclopedia can also be used as a basis for negotiations with contractors and contractors.
It should be noted that labor services may be affected by a variety of factors, including regional economic conditions, fluctuations in raw materials, policy adjustments, etc. Therefore, in practical application, we should also pay attention to market dynamics and adjust in a timely manner. In addition, in order to ensure the smooth progress of the project, a certain safety reserve should also be considered in case of possible unforeseen circumstances.
In short, the 2024 Electrical Engineering Labor Service Encyclopedia provides an important basis for the cost estimation of electrical engineering projects. In practice, the project manager should combine the actual situation, reasonably calculate the engineering quantity, pay attention to market dynamics, and ensure the smooth implementation of the project. construction site