Second-level constructor - memorize formulas for some knowledge points of regulatory subjects
The second construction of the "regulations" is mainly based on subjective memorization content, although the difficulty is relatively easy compared to the other two subjects, but we still do not allow us to relax, of course, there is a method for learning, vivid and vivid shorthand formulas, memorizing them can help improve scores, and can also make your preparation efficiency to a higher level.
Characteristics of the project that must be tendered:
1) Large-scale infrastructure, public utilities and other projects related to social public interests and public safety;(2) Projects invested in whole or in part with state-owned funds or financed by the state;(3) Projects that use loans and aid funds from international organizations or foreign countries. Formula: Foreign Big
Criteria for the size of the bid:(1) The estimated price of a single construction contract is more than RMB 4 million, (2) For the procurement of important equipment, materials and other goods, the estimated price of a single contract is more than RMB 2 million (3) For the procurement of survey, design, supervision and other services, the estimated price of a single contract is more than RMB 1 millionFormula: 421
Bidding Procedure:(Perform approval procedures, entrust bidding agencies, prepare bidding documents and bid bases, issue bidding announcements or bid invitations, qualification review, bid opening, bid evaluation, bid winning, and contract signing).Formula: The investment is all over the beginning, and the lottery will be won when the bottle is opened
The following construction projects must be supervised:(1) National key construction projects;(2) Large and medium-sized public utility projects;(3) Residential community projects developed and constructed in a piece;(4) Projects that use loans and aid funds from foreign countries or international organizations;(5) Other projects that must be supervised by the state. Formula: Foreign blockbusters
Social insurance for workers:(Basic endowment insurance, basic medical insurance, work-related injury insurance, unemployment insurance, maternity insurance).Formula: My husband is a doctor
Types of liability for breach of contract:Continue to perform, take remedial measures, stop the breach, compensate for losses, pay liquidated damages or deposits, etc. Formula: Continue to make a constant appointment
Programs that require special demonstration:Prepare a special construction plan for the following sub-projects that have reached a certain scale of risk: (1) foundation pit support and dewatering engineering;(2) Earthwork excavation works;(3) Formwork engineering;(4) Lifting and hoisting engineering;(5) Scaffolding works;(6) Demolition and blasting works;(7) ** Construction administrative departments or other relevant departments of other dangerous projects. Formula: The mobile phone dismantles the mold and falls into the soil pit
Probationary period of the employment contract(Contract period corresponds to the probationary period).
Special construction operations include:(1) Construction electrician;(2) Construction erector;(3) Construction Lifting Signal Operator;(4) Construction hoisting machinery driver;(5) Construction hoisting machinery installation and dismantling workers (6) Installation and dismantling workers of hanging baskets for high-altitude operationsFormula: Electric frame three lifting baskets
Works that do not require a construction permit:It is stipulated that the commencement report shall be handled, the construction of military houses, temporary buildings, emergency rescue and disaster relief, small buildings, and low-rise houses built by farmers themselvesFormula: **Temporary rescue of small houses