The Spring Festival is approaching, the flow of passengers out of Beijing has increased significantly, and it is expected that the peak of returning to Beijing from the sixth to the eighth day of the Lunar New Year will increase, and the traffic pressure around the railway station and airport, and the main highways in and out of Beijing will increase. In view of the increase in passenger flow in and out of Beijing before and after the Spring Festival holiday, the city's transportation industry has launched ten convenient service measures, including extending the operating hours of the subway, running a number of subway ferry lines, taxi party member fleet "checkpoint" transportation, highway exemption, key scenic business districts to increase parking supply, inter-provincial passenger station 24-hour bus service, etc., to serve the general public, tourists can go, go well, go smoothly, come back, and catch it.
The Municipal Transportation Commission warmly reminds the general public that during the Spring Festival holiday, the passenger flow in the railway station and airport area is large, and the surrounding roads are prone to congestion.
A number of subway lines have been operated in a delayed manner, and the "seven stations and two fields" have been continuously transported. According to the passenger flow of railway stations and airports, the capacity upgrade guarantee mechanism will be launched in a timely manner, and the subway lines will have sufficient capacity and extend the operation time. From February 5th (the 26th of the lunar month) to the 7th (the 28th of the lunar month), the operating hours of Metro Line 4 and Line 7 will be extended by 05 hours. On February 15 (the sixth day of the first month (the seventh day of the first month (the eighth day of the first month (the ninth day of the first month), Metro Line 2 extended the operating hours of 05 hours, Metro Line 4, Line 7 and Line 14 will extend the operating time by 1 hour, and the Capital Airport Line and Daxing Airport Line will extend the operating time by 05 hours, Beijing Fengtai Station of Metro Line 16 0Open door in 5 hours. According to the characteristics of the spatiotemporal distribution of passenger flow at railway stations and airports, reasonable on-site personnel are arranged at key locations such as entrances and exits, turnstiles, transfer channels, and escalators, and publicity and guidance are strengthened.
Dynamically adjust the number of buses and departure intervals to ensure continuous transportation around the seven major railway stations. Combined with the delayed operation of the subway, the night bus frequency is dynamically adjusted, the departure interval is shortened, and vehicles are reserved around key stations and dispatched at any time. No. 9 and No. 21 departing from Beijing West Railway Station will extend their operating hours. Beijing South Railway Station Night No. 17 and other night lines are equipped with mobile capacity. Beijing Fengtai Station has increased the frequency of night ferry lines from Xiajia Hutong. Beijing Chaoyang Railway Station runs a number of subway ferry lines. Beijing West Railway Station, Beijing South Railway Station and Fengtai Railway Station will focus on strengthening the nighttime continuous transportation guarantee during the peak period of passenger flow back to Beijing. Motor vehicles are arranged at 11 bus stations around 7 major railway stations, and vehicles are dispatched in a timely manner according to the passenger flow to ensure passenger travel.
The bus runs a number of subway ferry lines to facilitate passengers to arrive and depart from Beijing Chaoyang Station. During the pre-holiday peak (February 6 and 7), the capacity of Beijing Chaoyang Station and Metro Line 6, Line 10 and Line 14 will be increased, and the number of 413 trains will be encrypted, and a large number of station cars will be arranged at Liangmaqiao Station of Metro Line 10 and Dongfeng Beiqiao Station of Metro Line 14. From February 15 (the sixth day of the first lunar month) to February 18 (the ninth day of the first lunar month), 5 daily bus lines at Chaoyang Station in Beijing will increase the number of buses, and the frequency of direct subway ferry lines will be increased, and direct subway lines 14 and 10 will be added. In a timely manner, special 194 and 911 shuttle buses and holiday special lines were issued to direct Metro Line 6, and motor vehicles were arranged on No. 13 at night to evacuate the passenger flow in Beijing in a timely manner.
Airport buses have been added to operate on additional routes. Combined with the travel needs of passengers, adjust the station settings, reserve mobile capacity, and do a good job in airport transportation support. Passengers at Beijing Capital Airport can use the "Beijing Capital International Airport" mini program to check the navigation, frequency, and waiting time** of taxis, ride-hailing, subways, and airport buses, and have a one-click ticket purchase function. The maximum waiting time for passengers before 2:00 on the night route of Daxing Airport Bus is no more than 30 minutes, so that "the passenger will depart immediately and make up the shift at any time".
Taxi party member convoy "checkpoint" transportation. From February 2 (the 23rd day of the lunar month) to February 24 (the 15th day of the first lunar month), the drivers of the parade enterprises and 18 party member teams were organized to participate in the continuous transportation guarantee of the Spring Festival transportation and "checkpoint" at important stations. At the same time, it coordinated with key online car-hailing to establish a Spring Festival transportation support fleet, arranged more than 700 online car-hailing vehicles to provide special support for "seven stations and two venues" for connection transportation, and released the best information of flights and passenger volume to the online car-hailing platform in advance, and coordinated the platform to give priority to the airport and railway station. Coordinate with relevant departments to set up dedicated parking areas for online car-hailing to optimize the flow of the organization.
There are 23 tourist routes operated by buses. In order to better serve the needs of citizens for leisure tourism, during the festival, 16 sightseeing lines will be opened from the urban area to Gubei Water Town, Mutianyu, Hongluo Temple, Tanzhe Temple and other scenic spots, and 7 special lines will be opened to the three major cultural buildings of Universal Resort, Badaling Great Wall and Sub-center. According to folk activities and scenic spots, make arrangements for the capacity of the routes. Pay close attention to the real-time full load of vehicles on 24 bus routes such as No. 1 and No. 2 passing through 5 key business districts such as Wangfujing, Qianmen Pedestrian Street, Xidan, Shichahai and Gulou, and take temporary scheduling measures such as sections and express buses in a timely manner according to changes in passenger flow. In addition, we will pay close attention to the passenger flow of popular scenic spots and business districts such as Wukesong, Liangmaqiao, Sanlitun and Chaoyang Park, strengthen the reserve capacity of surrounding subway lines, and prepare for the delayed operation of key lines at night on peak days.
Increase the supply of parking in key scenic spots and business districts. Dongcheng District coordinates the setting of two temporary parking spaces around the temple fair, and the three major cultural buildings of the sub-center plan to temporarily add more than 2,000 parking spaces in combination with the surrounding idle sites. At the same time, relying on the MaaS platform, it shares the dynamic and static compliance data of the registered parking lot with the map service provider, releases the parking guidance service to the society, and improves the convenience of parking. The 20 P+R parking lots around 14 stations of 8 rail transit lines are open to the public 24 hours a day.
The interprovincial passenger station provides 24-hour bus service. Each station strengthens the management of the online ticketing system, does a good job in the ticket pre-sale plan, and publicizes it to the public in a timely manner; Increase the number of front-line station staff, increase the number of ticket sales and collection windows, and extend the time limit for advance tickets. For the lines with large passenger flow, the methods of opening special line ticket gates, dispatching vehicles into the station in advance, and circulating departures are adopted to reduce the waiting time of passengers. Passengers will be informed of flight delays, flight adjustments, etc., through announcements, electronic display screens, notices, etc. At the same time, 24-hour bus service is provided to passengers. Actively promote civilized service activities, standardize the civilized etiquette and service language of drivers and passengers, renovate the appearance of the car, and provide passengers with a fresh and tidy riding environment.
Tourist passenger lines are opened. Liuliqiao and other long-distance passenger stations have been opened to send tourist passenger lines to popular scenic spots such as Yanqing Olympic Park and National Alpine Skiing Center.
The expressway is guaranteed to be free of traffic. The free time of the 2024 Spring Festival Expressway is from 0:00 on February 9 (Chinese New Year's Eve) to 24:00 on February 17 (the eighth day of the new year), a total of 9 days, subject to the time of the networked toll system when the vehicle leaves the exit toll lane. Optimize and add 17 passenger car passages in and out of the toll station of Beijing Expressway, and the opening rate during peak hours is 100%. The expressway service area strengthens operation management and parking guidance, improves the service capacity and quality of charging, dining, toileting, etc., and 361 charging spaces in the expressway service area are in normal use during the Spring Festival, and 3 driver's homes are added.