The Spring Festival holiday has ended, and the construction site is about to resume work. In order to ensure the safety and smooth construction of the construction site, a series of preparations need to be carried out before the resumption of work. This article will introduce in detail the work that needs to be done on the construction site before resuming work after the Spring Festival to ensure the safe and smooth operation of the construction site.
1. Security checks.
Before resuming work after the Spring Festival, it is necessary to conduct a comprehensive safety inspection of the construction site to ensure that the construction site meets the safety production requirements. Specifically, it includes the following aspects:
1.Check whether the temporary facilities, safe passages, and fire-fighting facilities at the construction site are intact and meet safety requirements.
2.Check whether there are potential safety hazards in construction machinery, electrical equipment, wires and cables, etc., and whether they need to be repaired or replaced.
3.Check whether the fire-fighting equipment and emergency rescue equipment at the construction site are complete and effective, and regularly test and maintain.
4.Check the sanitary condition of the construction site to ensure that there is no garbage, no stagnant water, no debris, etc.
5.Check whether the safety protection equipment of the construction personnel is fully equipped and whether it meets the requirements of relevant regulations.
Second, the personnel to the post inspection.
Before resuming work after the Spring Festival, it is necessary to check whether the management personnel and operators on the site have arrived at their posts and ensure that they meet the relevant requirements. Specifically, it includes the following aspects:
1.Check whether the site management personnel have arrived and understand their work plans and arrangements.
2.Check whether the number and qualifications of construction personnel meet the requirements, and understand their health status and safety awareness.
3.Carry out pre-job training and safety education for new recruits to ensure that they master the necessary safety knowledge and skills.
4.Check whether the special operation certificate of the construction personnel is valid and ensure that it meets the requirements of relevant regulations.
3. Equipment overhaul and maintenance.
During the Spring Festival, the construction site is shut down for a long time, and many equipment has not been used for a long time, which is prone to failure or wear. Therefore, before resuming work, it is necessary to carry out a comprehensive overhaul and maintenance of the equipment to ensure its normal operation. Specifically, it includes the following aspects:
1.Carry out comprehensive inspection and maintenance of construction machinery, electrical equipment, instrumentation, etc., to ensure their normal operation.
2.Inspect and maintain the lubrication system of the equipment to ensure that the lubrication is good and prevent wear and failure of the equipment.
3.Inspect and maintain the hydraulic system of the equipment to ensure that the cleanliness and pressure of the hydraulic oil meet the requirements.
4.Inspect and maintain the electrical system of the equipment to ensure the integrity and normal operation of the electrical components.
5.Inspect and maintain the control system of the equipment to ensure the stability and reliability of the control system.
Fourth, material storage and management.
Before resuming work after the Spring Festival, it is necessary to do a good job in the storage and management of materials to ensure the normal progress of construction. Specifically, it includes the following aspects:
1.According to the construction plan and schedule requirements, make a material procurement plan in advance, and purchase the required materials according to the plan.
2.Acceptance and inspection of incoming materials to ensure that their quality is qualified and the quantity is accurate.
3.Classify, identify, and manage materials to prevent mixing and misuse of materials.
4.Regularly inventory and clean up the inventory of materials to ensure that the quantity and quality of materials meet the requirements.
5.Strengthen the management of the use of materials to prevent waste and loss.
5. Environmental sanitation and epidemic prevention measures.
During the Spring Festival, there is a large mobility of people, and the epidemic is prone to occur. Before resuming work, it is necessary to take environmental hygiene and epidemic prevention measures to ensure the safety of the construction site and the normal progress of construction. Specifically, it includes the following aspects:
1.Formulate epidemic prevention plans and emergency plans, and allocate necessary epidemic prevention materials and equipment.
2.The construction site and living areas are fully sanitized to ensure the cleanliness and hygiene of the environment.