Qiongzhong house foundation backfill sinking grouting construction treatment operation

Mondo Social Updated on 2024-02-20

It is understood that there are many people in Qiongzhong house foundation backfill sinking grouting construction treatment operation is not very understood, this article is a related article introduction, welcome to read.

Preparation: 1. Determine the construction nature and requirements of the backfill sinking grouting construction.

2.Formulate the construction plan, including the construction process, construction process and construction safety measures.

3.Check the condition of the foundation at the construction site to ensure that the foundation meets the construction requirements.

4.Prepare the materials and equipment required for construction, including grouting materials, grouting equipment, testing instruments, etc.

Construction technology: 1. Clean up the construction site to ensure that the construction area is clean and tidy.

2.Ground treatment is carried out, including excavation of the layer of soil to be filled, removal of debris and loose soil from the surface of the foundation.

3.Repair the foundation, repair the existing cracks, potholes, etc., to ensure that the surface of the foundation is flat.

4.Ground grouting is carried out, the grouting material is mixed with water in a certain proportion, and then the grouting material is injected into the foundation through a spraying device.

5.According to the need, layered construction can be carried out, that is, the grouting material is injected into the foundation in layers, and the backfill treatment is carried out layer by layer.

6.Compacting the foundation after grouting is carried out to ensure the stability and bearing capacity of the foundation.

7.According to the actual needs, multiple grouting treatments can be carried out to ensure the stability of the foundation.

Construction acceptance: 1. Carry out construction quality inspection to check whether the quality of grouting construction and the precautions in the construction process meet the requirements.

2.Accept the foundation after grouting to check whether the foundation is smooth and stable, and there is no obvious loosening or sinking.

3.The grouting effect is tested, and the bearing capacity of the grouting foundation is tested by using testing instruments to ensure that the design requirements are met.

4.Compile construction records, record the situation and results in the construction process, as the basis for follow-up maintenance and management.

5.Complete the construction acceptance and deliver it.