Construction plan of network computer room

Mondo Social Updated on 2024-02-06

The network computer room is the core of the information system, and its construction plan should consider multiple aspects to ensure the quality and safety of the construction. This article describes the main steps and key points of the network computer room construction plan, including pre-construction preparation, construction process, and post-construction acceptance.

1. Preparation before construction.

Before construction, it is necessary to make adequate preparations, including technical preparation, material preparation and personnel preparation.

1.Technical preparation.

Technical preparation is an important part of pre-construction preparation, including understanding the general situation of the project, preparing the construction plan, reviewing the design drawings and collecting relevant technical data. In the technical preparation stage, it is necessary to have a comprehensive understanding of the construction scale, functional requirements, and equipment configuration of the network equipment room, and formulate construction plans and design drawings based on these requirements. At the same time, it is necessary to ensure the completeness and accuracy of the relevant technical data for reference and verification during the construction process.

2.Preparation of supplies.

Material preparation includes aspects such as the procurement, transportation and storage of equipment and materials. According to the requirements of the construction plan and design drawings, the required equipment and materials need to be purchased in advance, and ensure that their quality and quantity meet the requirements. At the same time, it is necessary to reasonably arrange the transportation and storage of equipment and materials to avoid shortages or damage during the construction process.

3.Personnel preparation.

Personnel preparation includes aspects such as the organization and training of the construction team. It is necessary to select a construction team with relevant qualifications and experience, and provide them with technical training and safety education to ensure that they are competent for the construction of the network computer room. At the same time, it is necessary to develop a personnel management system and safety operation procedures to ensure quality and safety in the construction process.

Second, the construction process.

In the construction process, it is necessary to reasonably arrange the construction schedule and resources in accordance with the requirements of the construction plan and design drawings, and strictly control the construction quality.

1.Foundation engineering.

The foundation project is the foundation of the construction of the network computer room, including the construction of the ground, wall, ceiling and other parts. In the construction of foundation engineering, it is necessary to strictly control the construction quality to ensure that the ground is flat, the wall is smooth, and the ceiling is free of leakage. At the same time, it is necessary to consider the requirements of anti-static and dust-proof to meet the needs of the network computer room.

2.Equipment installation.

Equipment installation is an important part of the construction of network computer rooms, including the installation of servers, switches, routers and other equipment. In the process of equipment installation, it is necessary to reasonably arrange the layout and connection mode of the equipment according to the requirements of the design drawings, and ensure the stability and reliability of the equipment. At the same time, it is necessary to consider the requirements of heat dissipation and ventilation of the equipment to ensure the normal operation of the equipment.

3.Generic wiring.

Integrated cabling is one of the most cumbersome links in the construction of network computer room, including the laying and connection of power cables, network cables, optical fibers and other lines. In the process of integrated wiring, it is necessary to follow the corresponding standards and specifications, reasonably plan the direction and connection mode of the line, and ensure that the line is clearly marked and easy to maintain and manage. At the same time, it is necessary to consider the requirements of line redundancy and backup to improve the reliability and stability of the network room.

4.Monitoring system.

The monitoring system is one of the indispensable links in the construction of the network computer room, including the installation and commissioning of the first-class monitoring, access control and other systems. In the construction of the monitoring system, it is necessary to reasonably select the monitoring equipment and arrange the monitoring points in accordance with the requirements of the design drawings, and ensure the stability and reliability of the monitoring system. At the same time, it is necessary to consider the alarm and linkage requirements of the monitoring system to improve the security and protection capabilities of the network room.

5.Acceptance and delivery.

Acceptance and delivery is the final link in the construction of the network computer room, including preliminary acceptance, performance testing, and delivery. In the process of acceptance and delivery, it is necessary to test and accept the network equipment room in accordance with the corresponding standards and specifications, and ensure that the indicators of the network equipment room meet the requirements. At the same time, it is necessary to consider the requirements of the maintenance and management of the network equipment room, so that timely maintenance and management can be carried out during use.