With the acceleration of urbanization, more and more people choose to build their own houses in urban or rural areas. Self-built houses can not only meet the needs of individual living, but can also be designed and renovated according to personal preferences. However, building your own home is not an easy task and requires certain processes and norms to follow. This article will introduce the process of building a self-built house in detail to help you better understand the whole process of building a self-built house.
1. Preliminary preparation.
1.Site selection: First of all, it is necessary to choose a suitable plot, taking into account factors such as convenient transportation, perfect surrounding facilities, and flat terrain. At the same time, it is necessary to ensure that the selected land plots comply with national and local** land use policies.
2.Design: According to your own needs and budget, hire a professional architectural designer to design the first house. When designing, it is necessary to fully consider the function, structure, layout and other aspects of the house to ensure that the house is both beautiful and practical.
3.Approval: Submit the application for building a house to the local ** department, including land use right certificate, construction land planning permit, construction project planning permit, etc. Construction can only begin after obtaining approval from the relevant authorities.
Second, the construction stage.
1.Foundation treatment: According to the design requirements, carry out foundation excavation, earthwork backfill, foundation compaction, etc. The quality of foundation treatment is directly related to the safety and service life of the house, so it should be carried out in strict accordance with the design requirements and construction specifications.
2.Foundation construction: according to the design drawings, carry out foundation concrete pouring, steel bar binding and other work. Foundation construction is the foundation of the house structure, and quality and safety should be guaranteed.
3.Main construction: including wall masonry, floor pouring, roof construction, etc. The main construction should be carried out in accordance with the design drawings and construction specifications to ensure the stability and reliability of the house structure.
4.Installation engineering: including water and electricity installation, door and window installation, interior and exterior wall coating construction, etc. The installation project should ensure quality and safety, and at the same time pay attention to the connection with the main project.
5.Decoration project: According to the design plan, the interior and exterior decoration are carried out. The decoration project should pay attention to the requirements of environmental protection, energy saving, aesthetics and other aspects to ensure the comfort and quality of the house.
3. Acceptance and delivery.
1.Self-inspection: Before the completion of the house, the construction unit should conduct a comprehensive inspection of the house to ensure that the quality of the project meets the design requirements and construction specifications.
2.Supervision and acceptance: Please ask the professional supervision unit to accept the house to ensure the quality and safety of the project.
3.Owner's acceptance: After the supervision and acceptance are qualified, the owner will check and accept the house to confirm whether the quality and function of the house meet the design requirements and their own expectations.
4.Delivery: After passing the acceptance, the construction unit will deliver the house to the owner, and the owner can officially move into the new home.
The above is the process of building a self-built house, I hope it will be helpful to you.