Integrated prefabricated pumping station refers to the pumping station equipment that is pre-fabricated in the factory, including pumps, pipes, valves, etc., and then transported to the site as a whole for installation. The following is a detailed explanation of the installation and construction plan of the integrated prefabricated pumping station:
Foundation construction: First of all, it is necessary to carry out the construction work of the foundation on site according to the design requirements. Foundation construction includes the leveling of the ground and excavation of the foundation pit at the installation location of the pumping station.
Transport & Hoisting: Prefabricated pumping stations are reinforced and encapsulated in the factory and then transported to the site by means of transport. In the field, a crane or crane is required for lifting.
Pumping station positioning: Accurately locate the prefabricated pumping station into the foundation pit to ensure that the size and location between the pumping station and the foundation pit meet the design requirements.
Interface connection: connect all components in the prefabricated pumping station with pipelines, including inlet pipes, outlet pipes, electrical connections, etc. Ensure that the connection is securely sealed to prevent water and electricity leakage.
Pipeline arrangement: According to the design requirements, the inlet pipes, outlet pipes and related valves are arranged and installed. Ensure that the pipes are properly arranged and smooth so that the pumping station can operate normally.
Electrical support: the electrical equipment required for the installation of prefabricated pumping stations, including electric control cabinets, switches, cables, etc. At the same time, electrical connection and commissioning work are carried out to ensure the normal operation of the electrical system.
Commissioning and testing: After the installation, the commissioning and testing of the pumping station is required. The test includes the start, stop, pressure test of the pumping station, etc., to ensure that the performance of the pumping station meets the design requirements.
Safety protection: After the installation is completed, it is necessary to set up safety protection measures for the pumping station, including safety fences, warning signs, etc., to ensure the safe operation of the pumping station.
Acceptance and delivery: After the construction is completed, the acceptance of the pumping station needs to be carried out to ensure that the installation quality and performance of the pumping station meet the design and requirements. After passing the acceptance, it will be delivered for use.
It should be noted that the details of the integrated prefabricated pumping station installation and construction plan will vary according to the specific project requirements and site conditions. In the actual construction process, it is necessary to operate in strict accordance with relevant standards and specifications to ensure construction quality and safety.