How to lay polyurethane insulation pipes to save money? Hear what the experienced construction team

Mondo Social Updated on 2024-02-27

The laying method of polyurethane insulation pipe is very important for engineering construction. The correct laying method not only ensures the insulation effect, but also saves material and labor costs. Today, let's take a look at how the experienced construction team lays polyurethane insulation pipes more economically.

The laying method of polyurethane insulation pipe

There are two main laying methods for polyurethane insulation pipes, direct buried laying and overhead laying.

The polyurethane insulation pipe is directly buried in the ground, which is suitable for scenarios such as buried pipes or pipe corridors. It has the advantage of being easy to construct, does not require additional support structures, and can reduce pipeline materials, labor costs and maintenance expenses to a certain extent. Direct burial laying can save the support materials and engineering construction costs required for overhead laying.

The polyurethane insulation pipe is erected on the ground or above the building and fixed by a support structure. Overhead laying is suitable for piping systems that require frequent overhaul and maintenance, such as chemical plants, power stations, etc. Although overhead laying requires additional support structures and materials, it can reduce later repair and replacement costs due to its ease of maintenance and replacement.

When choosing a laying method, it is necessary to comprehensively consider the engineering requirements, terrain conditions, maintenance requirements and budget to determine the most suitable laying method. In addition, paying attention to the following points during construction can also save project costs and reduce resource waste.

When laying polyurethane insulation pipes, it is first necessary to choose the appropriate pipe size according to the actual needs. Avoiding over-design not only saves on material costs, but also reduces the cost of subsequent maintenance and replacement.

Make sure that the length and diameter of the pipe are accurately measured before the pipe is laid so that you can get just the right size when cutting the insulated pipe. Precise cutting minimizes scrap generation, resulting in material cost savings.

Insulation joints are a key link in the laying of polyurethane insulation pipes. In order to ensure thermal insulation performance, special attention should be paid to the handling of thermal insulation joints. Ensure tightness and fastening reliability at joints to prevent heat leakage and loss.

In the process of pipeline laying, according to the specific situation, the appropriate support spacing is selected, which can not only meet the requirements, but also reduce the cost of materials and labor.

The outer surface of polyurethane insulation pipes is usually coated with a layer of anti-corrosion paint or covered with an anti-corrosion layer. In the laying process, special attention should be paid not to damage the anti-corrosion layer to ensure the corrosion resistance of the pipeline. Avoiding damage to the anti-corrosion layer will reduce the cost of repair and replacement.

In the construction of the project, paying attention to these details and precautions can not only improve the construction efficiency, but also reduce the cost of materials and labor, and provide good thermal insulation performance for the project.