The brick master thought I had a lot of things, but I still told him these ten things!
Yesterday afternoon went to the house under renovation, it was time to put tiles, communicated with the master, put forward a few requirements, that is, these are a few I think are the right requirements, almost quarreled with the master, he thinks I have a lot of things, in fact, I feel that these are the most basic, if these places do not pay attention to the later stage, rework is very troublesome, and it is almost impossible to change.
Tiling is a fine job, not sloppy.
1.Don't make yang horn strips, make begonia horns, Now there is almost no yang angle strip, not beautiful, and it may fall off after a long time, it may take some effort to make begonia horns, but after the beauty is finished, it is really good-looking.
Begonia corner is much better than Yangjiao strip.
2.Before tiling, it should be typeset, and try not to appear small stripsIf it is unavoidable, then put the small strip behind the furniture, so that you can not see it, in fact, the responsible master will take the initiative to typeset for you and optimize it as much as possible.
Layout ahead of time and place the strips behind the furniture.
3.The bathroom should be cracked in the wall and floorNo matter how many specifications of tiles you choose, you must try to get through the joints, otherwise the lines are very messy in the later stage, and no matter how expensive the tiles are, they will not be able to produce the effect, especially the windows up and down, this place is the difficulty of typography.
Pay attention to the joints in the walls and floors, especially the upper and lower windows.
4.The whole house is paved, don't make a doorstone again, now there is no such thing, it is ugly, and the whole shop is beautiful and atmospheric.
It should be paved through, not over the doorstone.
5. After the bathroom is waterproofedRemember to pull the hair before tiling to avoid the tile falling off later.
The bathroom should be brushed.
6.Brick the kitchen check valveMany workers and owners ignore this, many owners have bought a good check valve, but after moving in, someone cooks, their own choking is terrible, and can not find the reason, in fact, there is a gap in the connection of the check valve, so be sure to paste the bricks, the check valve is installed on the tile.
The check valve should be installed to the tile.
7.It can be made as a whirlwind floor drain or trapezoidal floor drainDon't be too troublesome, otherwise the water will flow slowly.
8.Bathroom niches should remember to make slopesMany people ignore that after taking a bath, there is stagnant water, and if you forget to clean it, there will be a peculiar smell.
The niche should be sloped and not waterlogged.
9.Decide in advance whether it is a half-pack or a double-pack, a single package is cheap, but the tiles should be attached to the half of the stack.
10.To open the socket hole, you can use a special hole openerBeautiful, and easy to install later, of course, conditional can.
It's up to you.
11.The bathroom determines whether the wall is pressed against the floor or the floor against the wall, neither of which is ugly, but there will be a seam in the ground pressure wall. It is slightly ugly, and the seam is not beautiful, and water will accumulate under the brick.
Both are fine, but know the difference.