1. Overview
With the increasing shortage of water resources, reclaimed water treatment has become one of the important ways to save water. As a key equipment in reclaimed water treatment, the installation quality of the filter directly affects the treatment effect. This article will detail the installation guidelines for filters for reclaimed water treatment to help users install the filters correctly and in a standardized manner to ensure that they are operating properly and performing at their best.
2. Preparation before installation
1.Design Review:Confirm that the specifications and models of the filter meet the requirements of the reclaimed water treatment process. Check the equipment list to make sure all accessories are complete.
2.Basic Preparation:According to the equipment installation drawing, prepare the foundation of the appropriate size and solidity. The foundation should be flat and dry, and drainage ditches should be reserved.
3.Pipe Connection:Check and make sure all pipes are securely connected and free of leakage. For ease of installation, the valve on the inlet and outlet pipes can be temporarily removed.
4.Power & Control System:According to the requirements of the equipment, prepare the appropriate power supply and control system. Check whether the cable connection is firm to ensure that there is no short circuit, open circuit and other phenomena.
3. Filter installation steps
1.Hoisting in place:The filter is hoisted to a predetermined position on the foundation using a crane or manual to ensure that the equipment is placed smoothly.
2.Connecting the inlet and outlet pipes:Connect the inlet and outlet pipes to ensure that the joints are well sealed and free of leakage. Depending on the situation, it may be necessary to adjust the direction and height of the pipeline.
3.Mounting Accessories:Install and fix the necessary accessories, such as observation windows, drain valves, etc., according to the instructions provided by the manufacturer.
4.Connecting the power supply and control systemAccording to the requirements of the equipment, the power supply and control system are correctly connected. Make sure the cable connection is secure and there are no exposed parts.
5.Check the tightness:The filter and its accessories are inspected for tightness to ensure that there is no leakage.
6.Launch Test:To ensure that the filter is working properly, a start-up test is performed. First open the water inlet valve to discharge the air in the pipeline, and then gradually increase the flow rate to observe the operation of the equipment and the drainage.
4. Precautions
1.Comply with the equipment operation manual and safety regulations to ensure the safety of personnel during the installation process.
2.During installation, special care should be taken to protect the internal components of the filter from damage.
3.For filters with special requirements, the installation guide provided by the manufacturer should be followed.
4.After the installation is completed, system commissioning and performance testing should be carried out to ensure that the filter performance is up to standard.
5.For unqualified installations, rectification should be carried out in time, and debugging and testing should be carried out again.
6.During use, the filter should be regularly inspected and maintained to ensure its long-term stable operation.